My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2013_3
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2013_3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:43 PM
Creation date
7/3/2020 10:57:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2013_3
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2013_3.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
748
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
wide, with the weld centered along the length of the sample. The sample must be divided into three <br />sections: one 12 -inch by 12 -inch section for the Geosynthetics Contractor, one 12 -inch by 18 -inch <br />section for laboratory testing, and one 12 -inch by 12 -inch for the Owner to archive. Record the <br />results of field testing on the destructive seam tests form, the panel/seam log. <br />Third Party Laboratory Testing. All CQA destructive samples must be shipped to the <br />testing laboratory to verify seam quality. The laboratory will test five specimens from <br />each sample in each method used. Minimum test values are presented in the <br />specifications. The testing laboratory must provide test results within 24 hours, in <br />writing or via telephone, to the QA/QC Manager with certified test results to be provided <br />within 5 days. <br />The QA/QC Manager must immediately notify the Construction Manager and Geosynthetics <br />Contractor in the event of failed test results. <br />If the laboratory test fails in either peel or shear, the Geosynthetics Contractor must either reconstruct <br />the entire seam, or recover additional samples at least 10 feet on either side of the failed sample for <br />retesting. This process is repeated until passed tests bracket the failed seam section. All seams must <br />be bounded by locations from which passing laboratory tests have been taken. Laboratory testing <br />governs seam acceptance. In no case can field testing of repaired seams be used for final acceptance. <br />4.2.5 Repairs <br />Portions of geomembrane panels and seams that: (1) contain a flaw; (2) a destructive test; or (3) <br />nondestructive test cuts of holes, must be repaired in accordance with the Specifications. The <br />QA/QC Inspector must locate and record all repairs on the repair sheet and panel layout drawing. <br />Acceptable repair techniques include the following: <br />• Patching -used to repair large holes, tears, large panel defects, undispersed raw materials, <br />welds, contamination by foreign matter, and destructive sample locations. <br />• Extrusion - used to repair small defects in the panels and seams. In general, this <br />procedure should be used for defects less than FI -inch in the largest dimension. <br />• Capping - used to repair failed welds or to cover seams where welds cannot be <br />nondestructively tested. <br />• Removal - used to replace area with large defects where preceding methods are not <br />appropriate. Also used to remove excess material (wrinkles, fishmouths, intersections, <br />etc.) from the installed geomembrane. Areas of removal shall be patched or capped. <br />Repair procedures include the following: <br />• Abrade geomembrane surfaces to be repaired (extrusion welds only) no more than 1 hour <br />0 Page 35 <br />
The URL can be used to link to this page
Your browser does not support the video tag.