My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2013_3
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2013_3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:43 PM
Creation date
7/3/2020 10:57:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2013_3
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2013_3.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
748
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
before the repair. 0 <br />• Clean and dry all surfaces at the time of repair. <br />• Verify acceptance of the repair procedures, materials and techniques by the QA/QC <br />Inspector in advance of the specific repair. <br />• Extend patches or caps at least 6 inches beyond the edge of the defect, and round all <br />corners of material to be patched and the patches to a radius of at least 3 inches. Bevel <br />the top edges of patches before extrusion welding. <br />4.2.6 Wrinkles <br />During placement of materials over the geomembrane, temperature changes or creep may cause <br />wrinkles to develop in the geomembrane. Any wrinkles which can fold over must be repaired either <br />by cutting out excess material or, if possible, by allowing the geomembrane to contract by <br />temperature reduction. In no case can material be placed over the geomembrane which could result <br />in the geomembrane folding. The QA/QC Inspector must monitor geomembrane for wrinkles and <br />notify the, QA/QC Manager and Geosynthetics Contractor is wrinkles are being covered by soil. The <br />QA/QC Inspector is then responsible for documenting corrective action to remove the wrinkles. <br />4.2.7 Folded Material <br />All folded geomembrane must be removed. is <br />4.2.8 Geomembrane Anchor Trench <br />The geomembrane anchor trench should be left open until seaming is completed. Expansion and <br />contraction of the geomembrane should be accounted for in the liner placement. The anchor trench <br />should be filled in the morning when temperatures are coolest to reduce bridging of the <br />geomembrane. <br />4.2.9 Leak Location Testing <br />The QA/QC Consultant will perform leak location testing on the HDPE geomembrane twice during <br />construction of the cell. The first test shall be performed following geomembrane installation. The second test <br />shall be performed following placement of the granular drainage material and protective operations layer over <br />the geomembrane. The requirements for the leak location testing are included in Attachment A. <br />4.3 Geotextiles <br />4.3.1 Delivery <br />During delivery of geotextiles the QA/QC Inspector will: <br />Page 36 0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.