Laserfiche WebLink
TABLE b <br /> FORWARD LANDFILL <br /> CLOSURE COST ESTIMATE SUMMARY <br /> STAGE la PARTIAL CLOSURE AREA <br /> ITEM DESCRIPTION QUANTITY UNIT PRICE ESTIMATED COST <br /> 1 FINAL COVER <br /> Site Preparation(SurveylExplorafionZMobilizationI 1 is $230000.00 $230000 <br /> Landfill Closure Area 30.0 acres <br /> Preliminary Grading 30 acres $1,100.00 $33,000 <br /> Final Cover Placement 200,000 c $3.00 $600,000 <br /> 15urvey Monument Installation $3,000.00 900 <br /> Subtotal $872,000 <br /> 2 FINAL COVER CONSTRUCTION QUALITY ASSURANCE <br /> field Personnel/Monitoring/Reporting 30 acres 1 $3 550.00 $106,500 <br /> Subtotal $106500 <br /> 3 DRAINAGE CONTROL SYSTEM <br /> Downdrains 1900 jis <br /> $75.00 $142,500 <br /> Draina a Structures 1 $52,185.00 $52,185 <br /> RipRa Pads 1 $14000.00 $14,000 <br /> Subtotal $208685 <br /> 4 EROSION CONTROL <br /> Silt Fence 5,400.0 If $7.50 $40,500 <br /> Straw Wattles 5,025.0 If $2.25 $11,306 <br /> Seeding 28.18 acres $3 000.00 $84,L40 <br /> Subtotal $136,346 <br /> 5 LANDFILL GAS CONTROL SYSTEM PROTECTION/REI STALLATION <br /> Construction Mobilization Demobilization T Is $51,175,00 $51,175.00 <br /> Install Temporary 8"Jum er Pie Tees Saddles Fittfn s Is $76,437.06 $76,437.06 <br /> Salvage and Re-install existing Allied gass stem - Is W0,348.63 $270,348.63 <br /> Salvage and Re-install Covanta Energy gass stem - Is $19 709.70 $19,709.70 <br /> New Pipe and Fittings required to install final gass stem - Is $137,792.55 $137,792.55 <br /> En gingering ServicesIs 1 127,360.00 <br /> Subtotal $582,823 <br /> 6 LANDFILL GAS MONITORING SYSTEM 3 <br /> Subtotal $0 <br /> 7 ATER MONITORING S 3 <br /> Subtotal $0 <br /> 8 LEACHATE SEEP COLLECTORS <br /> Leachate Seep Collector 1 415 If 1 25.00 1 $10,375 <br /> Solid Leachate Seep Collector 1350 If 18.00 $24,300 <br /> Bi-Planer Double Sided Geonet 10350 sf 0.75 $7,763 <br /> Subtotal $42,438 <br /> 9 SITE SECURITY SIGNAGE 3 <br /> Subtotal $0 <br /> 10 1 STRUCTURE REMOVAL DECOMMISSIONING OF ENVIRONMENTAL CONTROL SYSTEMS 3 <br /> Subtotal $0 <br /> Forward landhil PCPCMPR <br /> 1.1Alliied\forward\2005.0051 Partial Closure\Partial Closure Plan\ClosCst.XLS;Revision t:6/14/2005 Page i of 2 <br />