Laserfiche WebLink
TABLE 6 <br /> FORWARD LANDFILL <br /> CLOSURE COST ESTIMATE SUMMARY <br /> STAGE IA PARTIAL CLOSURE AREA <br /> ITEM DESCRIPTION QUANTITY UNIT PRICE ESTIMATED COST <br /> ($) <br /> 11 ENGINEERING DESIGN(4) <br /> 1 Is E8= augo <br /> Subtotal $85,000 <br /> 12 ICONSTRUCtIONS <br /> 4%of co s ruction cost 1 Is 73 2 <br /> Subtotal $73 692 <br /> Total Construction:Cost $2,107,483 <br /> Contingency 20% $421,497 <br /> Total Closure Cost Estimate $2,528,980 <br /> Notes: <br /> (1) Costs for preparation and compaction of the existing one foot of foundation is included in this Item. <br /> (2) Cost assumes that only one foot of random soil would need to be placed for the foundation layer because one <br /> foot of soil would already be in place. <br /> (3) No cost is included in this category because the system Is currently in-place and/or no modification is required <br /> as part of the Stage IA partial closure. <br /> (4) Cost is for engineering design and preparation of construction documentation(plans and specifications)for <br /> bid purposes. <br /> (5) Cost is for monitoring contractors work,coordinating CQA activities,meetings,liaison between design <br /> engineers and contractors,etc. <br /> Forward Landfill PCPCMPR <br /> J:\Alhed\Forward\2005.0051 Partial Closure\Partial Closure Plsin\ClosCst.XLS;Revision t:6/14/2005 Page 2 of 2 <br />