Laserfiche WebLink
TABLE <br /> FORWARD LANDFILL <br /> CLOSURE COST ESTIMATE SUMMARY <br /> 187.6-ACRE CLOSURE AREA 2013 <br /> ITEM DESCRIPTION QUANTITY UNIT PRICE ESTIMATED COST <br /> ($) <br /> 1 PR CONSTRUCTION <br /> Mobilization 1.0 LS $200,000.00 $200,000 <br /> Construction Surveying 1.0 LS $60,000.00 60,000 <br /> tear and rub/ emo S t r u c t u r e s 5 ac .38 6 <br /> Subtotal $292,266 <br /> 2 FINAL COVER(1) <br /> Slope Areas(93.8 acres)(+1.08 SF=101.3) <br /> Preliminary Grading 4,412,802 sf $0.10 $441,280 <br /> Foundation Layer(2'thickness-1'existing)(2)(3) 163,599 cy 3.84 628,220 <br /> Vegetative/Barrier Layer(2'thickness) 327,198 cy $3.84 $1,256,440 <br /> Deck Areas(93.8 acres) <br /> Preliminary Grading 4,196,248 sf $0.10 $419,625 <br /> Foundation Layer(2'thickness-1'existing)(2)(3) 155,576 cy $3.84 $597,T12 <br /> Vegetative/Barrier Layer(2'thickness) 311,152 cy $3.84 $1,194,824 <br /> Survey Monument Installation 2 ea $1,100.00 $2,200 <br /> Subtotal $4,540,001 <br /> 3 FINAL COVER CONSTRUCTION QUALITY ASSURANCE <br /> Field Person nel/Monitoring/Reporti ng(4) 1 LS $317,191.00 $317,191 <br /> Subtotal $317,191 <br /> 4 DRAINAGE CONTROL SYSTEM <br /> See Attachment 1, back-up sheet for detailed <br /> breakdown. 1 LS $374,703.00 $374,703 <br /> 5 ON CONTROL(1) Subtotal $374,703 <br /> Soil Preparation 195.0 acres I $1,630.00 317,850 <br /> ee Ing 19b.0 acres s3,100.00 $604,50_ <br /> Subtotal $922,350 <br /> 6 GAS CONTROL SYSTEM <br /> See Attachment 2,back-up sheet for detailed 1 LS $1,934,155.00 $1,934,155 <br /> breakdown. <br /> Subtotal $1,934,155 <br /> 7 ISITE SECURITY(STAGE VIII) <br /> Ignage <br /> Subtotal $5,000 <br /> 8 1 DEMOLITION(5) <br /> Structure Removal 1 LS $50,000.00 $50,000 <br /> Subtotal $50,000 <br /> 9 IGAS MIGRATION MONITORING SYSTEM(6) <br /> Subtotal $0 <br /> 10 1GROUNDWATER MONITORING SYSTEM MODIFICATION(6) <br /> N/A $0.00 $0 <br /> Subtotal $0 <br /> Forward Landfill PCPCMP Amendment No.4 <br /> Z:\PROJECTS\Allied Waste\Forwa rd\Five Year Permit Rvw 2013\JTD-5 Yr PR 2O13\1ppendices\App A-PCPCMP 2013\Tables\Table 3-Clos Cost Estimate-2013; <br /> Amendment No.4:5/28/2013 Page 1 of 2 <br />