4. Moisture conditioning shall be uniform throughout each lift. Use tilling, <br /> ® discing, or other options to thoroughly mix soil and water. If underlying <br /> lifts are allowed to dry out, they shall be reconditioned and recompacted <br /> prior to placement of new liner material. <br /> 5. The clay liner shall be compacted in-place to a minimum dry density of <br /> 90 percent relative compaction at a water content of 3 to 6 percent greater <br /> than the optimum water content as measured by ASTM D1557. <br /> 6. Scarify surface of each lift to a depth of 2 inches prior to placing the <br /> subsequent lift of Clay Liner Material. <br /> 7. Clay Liner Material shall not be placed at a high water content so that <br /> excessive cracking occurs when the layer dries out. <br /> 8. Clay liner soil shall be sufficiently blended and compacted to provide a <br /> homogeneous clay liner sufficient to meet required permeability. <br /> 9. The top surface of the final lift shall be bladed smooth and recompacted <br /> with a non-vibratory steel drum roller to produce a smooth top surface free <br /> from tire or roller marks, holes, and depressions more than 1/2 inch deep. <br /> The top surface shall conform to the lines and grades shown on the <br /> Construction Drawings. <br /> 10. At the end of each construction day's activities, completed lifts or sections <br /> of compacted clay liner shall be sealed by rolling with a rubber tired, or <br /> smooth drum,rollers and sprinkled with water as needed. <br /> 11. Upon completion of the clay liner, the GEOSYNTHETICS <br /> CONTRACTOR shall place geomembrane lining as specified in <br /> Section 02778, HIGH DENSITY POLYETHYLENE (HDPE) <br /> GEOEBRANE The OWNER shall survey the termination edges of the <br /> HDPE Geomembrane at a minimum 75-foot interval. <br /> 12. Prepare the top surface of the clay liner for placement of the geomembrane <br /> liner by removing rock, debris, cracks, or other structural irregularities that <br /> could puncture or cause undue stress on the geomembrane liner. The top <br /> surface will be inspected and approved by the QA/QC CONSULTANT and <br /> the GEOSYNTHETICS CONTRACTOR prior to placement of the <br /> geomembrane lining. <br /> 13. All corners/edges of the finished clay liner shall be rounded in preparation <br /> for geomembrane lining installation. <br /> D. Moisture Control <br /> 1. During compacting operations, maintain water content in each lift of the <br /> Clay Liner Material within range of 3 to 6 percent greater than the optimum <br /> water content. <br /> 2. If Clay Liner Material is too dry, add water to material by sprinkling, then <br /> mixing or discing to make moisture content uniform throughout lift. <br /> 3. Do not attempt to compact Clay Liner Material that contains excessive <br /> moisture. Aerate material by blading, discing, harrowing, or other methods, <br /> to hasten drying process. <br /> ® E. Maintaining Clay Liner Condition: <br /> 1. Following completion of the clay liner, it shall be maintained in a moist <br /> Forward Landfill WMU FU-13 <br /> 02300 15 EARTHWORK <br />