My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2013_8
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2013_8
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:43 PM
Creation date
7/3/2020 10:57:25 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2013_8
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2013_8.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
358
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
acceptance testing by the QA/QC CONSULTANT. <br /> 2. The EARTHWORK CONTRACTOR shall process the Clay Liner Material <br /> suitable for the purpose intended. After processing, the Clay Liner Material <br /> shall be free from dry clods, roots, organic matter, frozen material, debris, <br /> rocks or stones larger than 1 inch, and other deleterious material. Clay <br /> Liner Material shall be thoroughly blended and compacted to provide a <br /> homogeneous material relatively uniform in gradation and moisture content. <br /> 3. The Clay Liner Material shall be as uniform as possible, free of penetrating <br /> cracks, and having interlift boundaries completely blended. The soil shall <br /> be kneaded by multiple passes with a heavy-weight footed compactor in <br /> order to produce a soil structure having low hydraulic conductivity, and not <br /> simply achieving a relative compaction goal. The top surface shall be <br /> smooth, graded to the grades shown on the Construction Drawings, and <br /> ready to receive overlying components of the lining system. The prepared <br /> surface shall be free of major irregularities, which in the opinion of the <br /> QA/QC CONSULTANT,may damage the overlying geomembrane. <br /> 4. The EARTHWORK CONTRACTOR shall notify the OWNER at least 3 <br /> working days in advance of when the clay is completed and ready for as- <br /> built surveys. The OWNER will survey the top of the clay liner to <br /> determine that the required minimum thickness and grades have been <br /> achieved. The survey shall be performed within two days of the clay liner <br /> being completed and in accordance with Section 01410, SURVEYS. The <br /> survey results will provide coordinates and elevations of the clay liner <br /> surface at the established 75-foot grid and delineating prominent features. <br /> The results of the survey shall be provided to the QA/QC CONSULTANT <br /> for approval prior to placing overlying materials. The QA/QC <br /> CONSULTANT`shall have 2 working days to review survey results and <br /> may independently verify survey results. The time taken by the QA/QC <br /> CONSULTANT in checking and verifying the survey results will be <br /> considered included in the total calendar days allotted the EARTHWORK <br /> CONTRACTOR before liquidated damages are assessed. <br /> B. After completion of excavation in the base, and prior to clay liner construction, <br /> proof-roll the excavation surface with a loaded dump truck or similar heavy- <br /> wheeled vehicle to detect soft or loose zones. Notify the QA/QC CONSULTANT <br /> prior to commencement of proof-rolling. If soft or loose zones are found, <br /> excavate the soft or loose material to a depth accepted by the QA/QC <br /> CONSULTANT, then fill and compact with Clay Liner Material. <br /> C. Clay Liner Compaction: <br /> 1. Start after the successful completion of the clay liner subgrade. <br /> 2. Soil shall be spread evenly over the prepared subgrade with a thickness as <br /> required to achieve a 6-inch compacted lift, with a maximum 8-inch loose <br /> lift. <br /> 3. The minimum final thickness of the clay liner shall be as shown on the <br /> Construction Drawings. <br /> Forward Landfill WMU FU-13 <br /> 02300 14 EARTHWORK <br />
The URL can be used to link to this page
Your browser does not support the video tag.