My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2013_8
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2013_8
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:43 PM
Creation date
7/3/2020 10:57:25 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2013_8
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2013_8.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
358
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The textured side of the HDPE geomembrane shall be facing down <br /> and shall be placed over the GCL in the lower box. <br /> 7) Place the geonet side of the geocomposite drainage net against the <br /> smooth side of the HDPE geomembrane. The geotextile side of the <br /> geocomposite drainage net shall be anchored to the upper box. <br /> 8) Saturate under test normal stress for 16 hours. Use normal stresses of <br /> 1,000;2,500;6,000;and 12,000 psf. <br /> 9) Shear at 0.04 in/min per ASTM D6243. <br /> 10)The testing laboratory should report the interface where deformations <br /> are observed, the initial moisture content of the bentonite component <br /> of the GCL,and the asperity of the geomembrane [GM-12]. <br /> b. A sample of each tested GCL shall be cut and tested for moisture content <br /> [ASTM D 2216] before and after testing. Moisture contents shall be <br /> recorded and submitted with the test results. The testing laboratory shall <br /> submit a 6-inch square sample of the GCL from the roll used in the testing <br /> to the QA/QC CONSULTANT. <br /> C. The asperity of the geomembrane [GM-12] used in testing shall be <br /> recorded aad the data submitted with the test results. The <br /> ,geomembrane used for testing shall be from one of the rolls that will <br /> be shipped to the site for construction of the liner. A 6-inch square <br /> sample of the geomembrane used in testing shall be submitted by the <br /> testing laboratory to the QA/QC CONSULTANT. <br /> PART 3 EXECUTION <br /> 3.1 FAMILIARIZATION <br /> A. Prior to ' implementing any of the work described in this Section, the <br /> GEOSYNTHETICS CONTRACTOR shall become thoroughly familiar with the <br /> site,the site conditions, and the portions of the work falling within this Section. <br /> B. Inspection: <br /> 1. Prior to implementing any of the work of this Section, the <br /> GEOSYNTHETICS CONTRACTOR shall carefully inspect the installed <br /> work of all other Sections and verify that all such work is complete to the <br /> point where the installation of this Section may properly commence without <br /> adverse impact. <br /> 2. If the GEOSYNTHETICS CONTRACTOR has any concern regarding the <br /> installed work of other Sections, he should immediately notify the QA/QC <br /> CONSULTANT prior to start of work of the Section. Installation of the <br /> geosynthetic clay liner will be construed as GEOSYNTHETICS <br /> CONTRACTOR'S acceptance of the related work of all other Sections, <br /> Forward Landfill WMU FU-13 6 GEOSYNTHETIC CLAY LINER(GCL) <br /> 02777 <br />
The URL can be used to link to this page
Your browser does not support the video tag.