My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2013_8
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2013_8
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:43 PM
Creation date
7/3/2020 10:57:25 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2013_8
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2013_8.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
358
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
including the subgrade. <br /> 3.2 ACCEPTANCE TESTING <br /> A. Upon delivery to the site, samples of the geosynthetic clay liner shall be removed by <br /> the QA/QC CONSULTANT and tested to ensure conformance to these <br /> Specifications. Only materials passing the acceptance tests shall be installed. <br /> B. Samples shall be selected by the QA/QC CONSULTANT in accordance with the <br /> procedure outlined in the CQA Manual. <br /> C. Samples shall be taken at the rate of one sample per lot or one per 100,000 sq. ft <br /> (9,300 sq. m), whichever is greater and tested for bentonite mass per unit area, peel <br /> strength and hydraulic conductivity. Direct Shear tests as described in Section 2.LA <br /> shall also be performed. <br /> D. The QA/QC CONSULTANT will increase the frequency of sampling in the event <br /> that test results are negative. This additional testing shall be performed at the <br /> expense of the GEOSYNTHETICS CONTRACTOR. <br /> E. Any materials that are not certified by the Manufacturer in accordance with this <br /> section, or that has a hydraulic conductivity greater than that specified in this <br /> Section shall be rejected and replaced, at no additional cost to the OWNER. <br /> 3.3 SURFACE PREPARATION <br /> A. The EARTHWORK `CONTRACTOR shall be responsible for preparing the <br /> supporting(subgrade) soil. <br /> B. The subgrade shall be prepared in accordance with Section 02300,EARTHWORK. <br /> C. The subgrade surface shall be proof-rolled to identify soft zones, and eliminate <br /> irregularities, ruts, and abrupt changes in grade. Any unacceptable areas shall be <br /> repaired 'by the EARTHWORK CONTRACTOR, at no additional cost to the <br /> OWNER. <br /> 3.4 ANCHORAGE SYSTEM <br /> A. The anchor trench shall be excavated by the EARTHWORK CONTRACTOR prior <br /> to geosynthetic clay liner placement,to the lines and grades shown on the drawings. <br /> B. No loose soil shall be allowed in the anchor trench beneath the geosynthetics. <br /> C. The geosynthetic clay liner shall be anchored with compacted general earthfill, as <br /> identified on the drawings. <br /> D. Care shall be taken when backfilling the trenches to prevent any damage to the <br /> geosynthetic clay liner. <br /> ® Forward Landfill WMU FU-13 7 GEOSYNTHETIC CLAY LINER(GCL) <br /> 02777 <br />
The URL can be used to link to this page
Your browser does not support the video tag.