My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2013_8
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2013_8
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:43 PM
Creation date
7/3/2020 10:57:25 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2013_8
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2013_8.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
358
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
it becomes hydrated. <br /> M. All hydrated geo0Mthetic clay liner shall be removed and replaced by the <br /> GEOSYNTHETICS CONTRACTOR at no additional cost to the OWNER. <br /> Hydrated GCL is defined as material that has become soft as determined by <br /> squeezing the material with finger pressure, material that has exhibited swelling, or <br /> material that has a moisture content greater than 100 percent as determined by <br /> ASTM D2216 or ASTM D4643. Cause for replacement of the GCL due to <br /> exposure to moisture and subsequent hydration shall be determined at the QA/QC <br /> CONSULTANT's sole discretion. <br /> 3.6 SEAMS AND OVERLAPS <br /> A. On slopes steeper than 10 horizontal to 1 vertical, all geosynthetic clay liners shall <br /> be continuous down the slope; that is, no horizontal seams shall be allowed on the <br /> slope. <br /> B. No horizontal seams shall be allowed on the base and the crest of the landfill within <br /> 5 ft(1.5 m)of the toe or the crest of the slope. <br /> C. All geosynthetic clay liners shall have overlapped seams. Along the length(i.e., the <br /> sides) of the mat, the overlap shall be 12 in minimum. Along the width (i.e., the <br /> ends)of the mat,the overlap shall be 12 in minimum. <br /> D. The overlaps shall not be nailed or stapled to the subgrade. <br /> E. Granular bentonite shall be placed on the overlaps. <br /> 3.7 MATERIALS IN CONTACT WITH THE GEOSYNTHETIC CLAY LINER <br /> A. Installation on rough surfaces shall be carefully performed to minimize damage to <br /> the geosynthetic clay liner. <br /> B. Equipment used for placing soils shall not be driven directly on the geosynthetics <br /> overlying the geosynthetic clay liner. A minimum thickness of 1 ft of material is <br /> required between a low ground pressure dozer(such as a wide pad Caterpillar D-4 <br /> bulldozer or equivalent) and the geosynthetic clay liner. A minimum thickness of <br /> 3 ft of material is required between rubber-tired vehicles and the geosynthetic clay <br /> liner. In areas of heavy vehicle traffic, such as access ramps, the material <br /> thickness should be at least 3 ft. The following table shall be complied with <br /> during construction: <br /> ® Forward Landfill WMU FU-13 9 GEOSYNTHETIC CLAY LINER(GCL) <br /> 02777 <br />
The URL can be used to link to this page
Your browser does not support the video tag.