My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2013_8
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2013_8
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:43 PM
Creation date
7/3/2020 10:57:25 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2013_8
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2013_8.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
358
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Maximum <br /> Equipment Ground Pressure Initial Lift Thickness <br /> (psi) ft <br /> 5 1.0 <br /> 10 1.5 EA1 <br /> 20 2.0 <br /> >20 >3.0 <br /> C. Installation of the geosynthetic clay liner areas with appurtenances areas, and <br /> connection of the geosynthetic clay liner to appurtenances shall be made according <br /> to the Construction Drawings. The GEOSYNTHETICS CONTRACTOR shall <br /> ensure that the geosynthetic clay liner is not damaged while working around the <br /> appurtenances. <br /> 3.8 REPAIR <br /> A. Any holes or tears in the geosynthetic clay liner shall be repaired by placing a <br /> geosynthetic clay liner patch over the hole. On slopes greater than 5 percent, the <br /> patch shall overlap the edges of the hole or tear by a minimum of 2 ft (0.6 m) in all <br /> directions. On slopes 5 percent or flatter, the patch shall overlap the edges of the <br /> hole or tear by a minimum of 1 ft(0.3 m) in all directions. The patch shall be <br /> secured with a water-based adhesive, if approved by the Manufacturer and by the <br /> QA/QC CONSULTANT. <br /> B. Care shall be taken to remove any soil or other material that may have penetrated the <br /> torn geosynthetic clay liner. <br /> C. All repairs shall-be made at no additional cost to the OWNER. <br /> D. The patch shall not be nailed or stapled. <br /> 3.9 PRODUCT PROTECTION <br /> A. The GEOSYNTHETICS CONTRACTOR shall use all means necessary to protect <br /> all prior work and materials and completed work of other Sections. <br /> B. In the event of damage,the GEOSYNTHETICS CONTRACTOR shall immediately <br /> make all repairs and replacements necessary, to the approval of the QA/QC <br /> CONSULTANT and at no additional cost to the OWNER. <br /> 3.10 ACCEPTANCE <br /> A. GEOSYNTHETICS CONTRACTOR shall retain ownership and responsibility <br /> for GCL until accepted by OWNER. <br /> B. OWNER will accept GCL when all of the following conditions are met: <br /> 1. The installation is complete. <br /> Forward Landfill WMU FU-13 10 GEOSYNTHETIC CLAY LINER(GCL) <br /> 02777 <br />
The URL can be used to link to this page
Your browser does not support the video tag.