My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2013_8
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2013_8
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:43 PM
Creation date
7/3/2020 10:57:25 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2013_8
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2013_8.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
358
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
e. C; - Soil Interaction Coefficient value shall be determined from long-term <br /> effective stress pullout tests per GRI-GG5,unless the junction creep <br /> testing of the geogrid is used to determine Ta. The C;value is determined <br /> as follows: <br /> C;= F <br /> 2 L 6N tan <br /> Where: F=Pullout force(lb/ft),per GRI-GG5 <br /> L=Geogrid Embedment Length in Test(ft) <br /> 6N=Effective Normal Stress(psf) <br /> =Effective Soil Friction Angle, Degrees <br /> PART 3 EXECUTION <br /> 3.1 EXAMINATION <br /> A. The GEOSYNTHETIC CONTRACTOR and QA/QC CONSULTANT shall check <br /> the geogrid upon delivery to verify that the proper material has been received. The <br /> geogrid shall be inspected by the QA/QC CONSULTANT to be free of flaws or <br /> damage occurring during manufacturing, shipping, or handling. <br /> 3.2 PREPARATION <br /> A. The subgrade soil shall be prepared as indicated on the Construction Drawings or as <br /> directed by the DESIGN ENGINEER. Foundation soil shall be excavated to the lines <br /> and grades as shown on the drawings or as directed by the DESIGN ENGINEER. <br /> Overexcavated areas shall be filled with compacted backfill material. <br /> 3.3 INSTALLATION <br /> A. Geogrid shall be laid at the proper elevation and orientation as shown on the <br /> construction drawings or as directed by the DESIGN ENGINEER. Correct orientation <br /> (roll direction) of the geogrid shall be verified by the QA/QC CONSULTANT. <br /> Geogrid may be temporarily secured in place with staples, pins, sand bags, or backfill <br /> as required by fill properties, fill placement procedures, or weather conditions, or as <br /> directed by the DESIGN ENGINEER. <br /> B. Geogrid soil reinforcement shall be connected/spliced when required to provide <br /> continuity of tensile resistance. Geogrids shall be connected with a mechanical <br /> polymer bar. <br /> Forward Landfill WMU FU-13 <br /> 02779 6 GEOGRID <br />
The URL can be used to link to this page
Your browser does not support the video tag.