My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2013_8
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2013_8
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:43 PM
Creation date
7/3/2020 10:57:25 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2013_8
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2013_8.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
358
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C. Overlap connections may be used if the GEOSYNTHETICS CONTRACTOR <br /> provides the DESIGN ENGINEER independent test documentation which <br /> demonstrates that the load/deformation characteristics of the overlap of geogrid <br /> materials is equal to or exceeds those of the geogrid. The minimum overlap shall be 3 <br /> feet. <br /> 3.4 FILL PLACEMENT OVER GEOGRID <br /> A. Backfill material shall be placed in lifts and compacted as directed under Section <br /> 02300. Backfill shall be placed, spread, and compacted in such a manner that <br /> minimizes the development of wrinkles in and/or movement of the geogrid. <br /> B. Tracked construction equipment shall not be operated directly on the geogrid. A <br /> minimum fill thickness of 6 inches is required prior to operation of tracked vehicles <br /> over the geogrid. Turning of tracked vehicles should be kept to a minimum to prevent <br /> tracks from displacing the fill and damaging the geogrid. <br /> 3.7 REPAIR <br /> A. Any geogrid damaged during installation shall be replaced by the either the <br /> EARTHWORK CONTRACTOR or GEOSYNTHETICS CONTRACTOR, <br /> depending on the party that caused the damage, at no additional cost to the Owner. <br /> B. Coated geogrids shall not be used if the coating is torn, shedding, cracked, punctured, <br /> flawed or cut, unless a repdir procedure is carried out as approved by the Design <br /> Engineer. The repair procedure shall include placing a suitable patch over the <br /> defective area or applying a coating solution identical to the original coating. <br /> 3.8 PROTECTION <br /> A. Follow the Manufacturer's recommendations regarding protection from exposure to <br /> sunlight. <br /> PART 4 MEASUREMENT AND PAYMENT (Refer to Section 01200, MEASUREMENT <br /> AND PAYMENT PROCEDURES) <br /> END OF SECTION <br /> Forward Landfill WMU FU-13 <br /> 02779 7 GEOGRID <br />
The URL can be used to link to this page
Your browser does not support the video tag.