My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2013_8
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2013_8
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:43 PM
Creation date
7/3/2020 10:57:25 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2013_8
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2013_8.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
358
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
April 2013). The base liner will encompass approximately 4.2-acres and will extend approximately <br /> 350 feet in the north-south dimension and 750 feet in the east-west dimension. The base of <br /> WMU FU-13 at the top of clay liner will range from approximately elevation 7-feet to 13-feet,which <br /> is about 22 to 28 feet below the surrounding ground surface.A composite lining system consisting of <br /> a 2-foot-thick clay liner overlain by a 60-mil,high-density polyethylene(HDPE)geomembrane,and <br /> LCRS consisting of 1 foot of granular drainage material will be constructed on the WMU FU-13 <br /> base. HDPE leachate tanks will be placed at the eastern edge of the WMU FU-13 base,from which <br /> leachate will be pumped and removed. <br /> Side slope liners will be constructed on the northern slope. The side slope liner on the north slope <br /> consists of a geosynthetic clay liner (GCL) overlain by a 60-mil, single-sided textured, HDPE <br /> geomembrane, and a single-sided geocomposite drainage net (GDN). A portion of the northern <br /> WMU FU-13 slope is at an approximately 4.5:1 (horizontal to vertical)slope and is underlain by the <br /> former Austin Road Landfill. To provide support for the side slope liner,an approximately 4 to 5-ft <br /> thickness of subgrade fill(1-ft of subgrade fill was previously placed as intermediate cover over the <br /> former Austin Road Landfill)will be placed and compacted over the portion of the former Austin <br /> Road Landfill that underlies WMU FU-13. <br /> A liner and leachate collection system was constructed on the top deck of the former Austin Road <br /> Landfill as part of the Northern Portion of WMU FU-08 construction. Leachate from the lined <br /> WMU FU-08 North top deck area currently drains through a series of pipes to a leachate tank. The <br /> portion of WMU FU-13 that intersects WMU FU-08 North will be connected to WMU FU-13 so that <br /> the leachate from this portion;of the top deck can drain directly into WMU FU-13. <br /> Class III Refuse placed in the northern portion of WMU FU-08 will be separated from the Class II <br /> refuse that can be placed in WMU FU-13 by placing Class III refuse a minimum of 50-ft south of the <br /> northern/southem boundary of the cell,thereby providing sufficient separation. <br /> 1.3 Reference Documents <br /> The following reference documents provide background information and support this CQA manual: <br /> WMU FU-13 Design and Construction Documents, Forward Landfill, Lewis Engineering, <br /> April 2013. <br /> American;Society for Testing and Materials (ASTM) Annual Book of ASTM Standards. <br /> Section 4 Construction, Volume 04.02 Concrete and Aggregates. <br /> American Society for Testing and Materials (ASTM) Annual Book of ASTM Standards. <br /> Section 4 Construction, Volume 04.08 Soil and Rock; Dimension Stone; <br /> GEOSYNTHETICS. <br /> American Society for Testing and Materials (ASTM Annual Book of ASTM Standards. <br /> Section 8 Plastics, Volumes 08.01 Plastics (I), 08.02 Plastics (II), and 08.03 Plastics <br /> (III). 0 <br /> Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.