My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2013_8
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2013_8
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:43 PM
Creation date
7/3/2020 10:57:25 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2013_8
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2013_8.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
358
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
before the repair. <br /> • Clean and dry all surfaces at the time of repair. <br /> • Verify acceptance of the repair procedures, materials and techniques by the QA/QC <br /> Inspector in advance of the specific repair. <br /> • Extend patches or caps at least 6 inches beyond the edge of the defect, and round all <br /> corners of material to be patched and the patches to a radius of at least 3 inches. Bevel <br /> the top edges of patches before extrusion welding. <br /> 4.2.6 Wrinkles <br /> During placement of materials over the geomembrane, temperature changes or creep may cause <br /> wrinkles to develop in the geomembrane. Any wrinkles which can fold over must be repaired either <br /> by cutting out excess material or, if possible, by allowing the geomembrane to contract by <br /> temperature reduction. In no case can material be placed over the geomembrane which could result <br /> in the geomembrane folding. The QA/QC Inspector must monitor geomembrane for wrinkles and <br /> notify the,QA/QC Manager and Geosynthetics Contractor is wrinkles are being covered by soil. The <br /> QA/QC Inspector is then responsible for documenting corrective action to remove the wrinkles. <br /> 4.2.7 Folded Material <br /> All folded geomembrane must be removed. <br /> 4.2.8 Geomembrane AnchorTrench <br /> The geomembrane anchor trench should be left open until seaming is completed. Expansion and <br /> contraction of the geomembrane should be accounted for in the liner placement. The anchor trench <br /> should be filled in the morning when temperatures are coolest to reduce bridging of the <br /> geomembrane. <br /> 4.2.9 Leak Location Testing <br /> The QA/QC Consultant will perform leak location testing on the HDPE geomembrane twice during <br /> construction of the cell. The first test shall be performed following geomembrane installation.The second test <br /> shall be performed following placement of the granular drainage material and protective operations layer over <br /> the geomembrane. The requirements for the leak location testing are included in Attachment A. <br /> 4.3 Geotextiles <br /> 4.3.1 Delivery <br /> During delivery of geotextiles the QA/QC Inspector will: <br /> Page 36 <br />
The URL can be used to link to this page
Your browser does not support the video tag.