Laserfiche WebLink
geomembrane. <br /> • Verify that the geocomposite is securely anchored to prevent movement by the wind. <br /> • Verify that adjacent panels are overlapped and seamed in accordance with the <br /> Specifications. <br /> • Examine the geocomposite after installation to ensure that no potentially harmful foreign <br /> objects are present. <br /> The QA/QC Inspector must inform both the QA/QC Manager and the Geosynthetics Contractor if <br /> the above conditions are not met. <br /> 4.4.4 Repairs <br /> Repair procedures include: <br /> • Patching--used to repair large holes,tears, and small defective areas. <br /> • Removal--used to replace large defective areas where the preceding method is not <br /> appropriate. <br /> Repair procedures shall be performed per`specifications. <br /> 4.5 Geosynthetic Clay Liner (GCL) <br /> 4.5.1 Delivery <br /> During delivery of GCL the QA/QC Inspector will: <br /> • Verify that equipment used to unload the rolls will no damage the GCL. <br /> • Verify that care is used to unload the rolls. <br /> • Verify that all documentation required by the Specifications has been received. <br /> • Verify that each roll is marked or tagged with the following information:manufacturer's <br /> name; project identification; lot number; roll number; roll dimensions. Log this <br /> information on the geosynthetic receipt form. <br /> • Verify that the geosynthetic receipt form is completed. <br /> Page 42 <br />