My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2013_8
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2013_8
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:43 PM
Creation date
7/3/2020 10:57:25 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2013_8
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2013_8.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
358
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
® Test Results.The QA/QC Consultant will examine all results from laboratory acceptance testing and <br /> will report any nonconformance to the Construction Manager. <br /> Acceptance Test Failure.If a Geocomposite acceptance sample does not comply with the minimum <br /> requirements of the Specifications,the Geocomposite roll from which the sample was taken will be <br /> failed by the QA/QC Consultant,and replaced by the Geocomposite Manufacturer at no additional <br /> cost to the Owner. The Design Engineer shall be contacted to determine additional acceptance <br /> testing requirements. <br /> 4.4.3 Geocomposite Drainage Net Installation <br /> Surface Preparation. Before geocomposite installation, the QA/QC Inspector will: <br /> • Verify that all lines and grades have been verified by the Earthwork Contractor. <br /> • Verify that the underlying geomembrane has been prepared in accordance with the <br /> specifications, and that all associated documentation has been completed. <br /> • Verify that soil or geomembrane surfaces do not contain protrusions that could damage <br /> the geocomposite. <br /> • Verify that there are no excessively soft areas that could damage the geocomposite. <br /> • All construction stakes have been removed. <br /> • Verify that all aspects of surface preparation have been performed according to the <br /> specifications. <br /> Geocomposite Placement and Seaming. During geocomposite placement the QA/QC Inspector <br /> will: <br /> • Observe the geocomposite as it is deployed and record all defects and defect corrective <br /> actions(panel rejected,patch installed,etc.). Verify that corrective actions are performed <br /> in accordance with the specifications. <br /> • Verify that equipment used does no damaged the geocomposite by handling,equipment <br /> transit, leakage of hydrocarbons, or other means. <br /> • Verify that crews working on the geocomposite do not smoke, wear shoes that could <br /> damage the geocomposite, or engage in activities that could damage the geocomposite. <br /> • Verify that the geonet side of the geocomposite is placed against the smooth side of the <br /> Page 41 <br />
The URL can be used to link to this page
Your browser does not support the video tag.