My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2013_8
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2013_8
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:43 PM
Creation date
7/3/2020 10:57:25 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2013_8
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2013_8.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
358
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
® 5 CONSTRUCTION QUALITY ASSURANCE FOR HDPE <br /> PIPE AND TANKS <br /> 5.1 Introduction <br /> This section describes CQA procedures for high density polyethylene (HDPE) pipe and tank <br /> installations. Perforated and solid HDPE pipe will be utilized to construct the leachate collection and <br /> recovery systems. <br /> CQA for the HDPE pipe and tank installations will be performed to verify that HDPE pipe systems <br /> and tanks are installed in accordance with the design. Construction must be conducted in accordance <br /> with the Construction Drawings and Specifications. To monitor compliance,the CQA program will <br /> (1) review the Contractor's quality control submittals; (2) monitor construction testing; and (3) <br /> monitor installations. <br /> All construction testing will be conducted in accordance with the Specifications. <br /> 5.2 Construction Monitoring <br /> The following sections list monitoring requirements during HDPE pipe and tank operations. <br /> 5.2.1 Delivery,Handling, and Storage <br /> • Verify that chains,end hooks,cable slings,or any other devices that may scar the pipe or <br /> tank are not used for handling. Wide nylon web slings are recommended to handle the <br /> pipe. <br /> • Verify that the pipe or tanks are not damaged during handling operations and that <br /> damaged pipe or tanks are separated from accepted materials. <br /> • Verify that pipe out-of-roundness will not occur due to excessive stacking heights when <br /> the pipe is stored at the site. Recommended stacking heights for pipe are provided in the <br /> following chart: <br /> Page 49 <br />
The URL can be used to link to this page
Your browser does not support the video tag.