Laserfiche WebLink
�or?pIv with th,e eq, uireraer,ts of t},i s G=n rat pe ; t <br />r-1 <br />rlo later than ::ug1-1St 1, 1997. <br />il. If the Regional Water B:.:,ard determines that a disc} -large <br />rr_%_ he cauSi_nq or Contri '11ting 'LO all eXC -dance c early <br />applicable water standards cr,ntained in a <br />Statewide Water Quality Control Plan or the applicable <br />Regional Water Board's Basin Plan, the Regional Water <br />Board may order the facility operator to comply with the <br />requirements described in Receiving NaLe-i <br />Limitation C.3. The facility operator shall comply with <br />the requi rerr.ents f.ithi.rl the t.irn-C� schedule established by <br />the P.egional Water B�:,ard. <br />12. If the facility operator determines that its storm grater <br />discharges or authorized rl�:an-storm water discharges are <br />causing or contributing to an exceedance of any <br />applicahle water quality standards, the facility operator <br />}gall col -,.I -Ay ',lith i h.e R=ce'lG ] riq <br />t° v te, ! ir.11 f ii.l' <br />1J. Stat.a 'Na n-i0a1G 0rde, r tlo -nl C!�J,l (�:iS aal e r!d'i1 r; <br />