Laserfiche WebLink
r1 <br />potentiaL for spills and leaks and to Minimize <br />exp <br />inrm, ,- <br />p Te of ign 1 1.c I n i','. _ _e ials to stcrT wavy, , =ill C! <br />arMAzed non -storm water dischaigen. <br />V. Employee Training <br />This includes training of personnel who are <br />responsible for (1) implementing activities <br />identified in the SWPPP, (') conducting inspections, <br />sampling, and visual_ observations, and (3) managing <br />storm water. Training should address topics such as <br />spill response, good housekeeping, and material <br />handling procedures, and actions necessary t o <br />implement all BMPs identified in the SWPPP. The <br />SWPPP shall identify periodic dates for such <br />training. r%.Ecoids stall be mvintair ed of all <br />training sessions hold. <br />AML V i WSW HanNing/Pecycling <br />This includes the procedures or processes to handle, <br />store, or CA1SpC7S=' of `r1aSi_F materials Or r=•C;!Cla1_le <br />materials. <br />VA. Rec:ordkeepi n g and internal Reporting <br />ing <br />This includes the procedures to ensure that all <br />records of inspections, spills, maintenance <br />activities, corrective actions, visual observations, <br />etc., are developed, retained, and provided, as <br />necessary, to the appropriate facility personnel. <br />Erosion Control and Site Stabilization <br />This includes a description of all se'diITlent and <br />erosion control activities. This may include the <br />planting and maintenance of vegetation, diversion of <br />run-on and runoff, placement of sandbags, silt <br />screens, or other sediment control devices, etc. <br />A. Lnspections <br />This includes, in addition to the preventative <br />maintenance inspections identified above, an <br />inspection schedule of all potential pollutant <br />sources. Tracking and follow-up procedures shall be <br />