Laserfiche WebLink
LJ <br />`Phis includes inlet cont_rc>ls, infi.ltiation de°tikes <br />Oil/''later" Separators, detention, pond's, vf-getativ , <br />swales, etc. that redace- the pollutants in storm <br />Water disc;"iarcles and aut-horizeci I!O,-Stc-)Im ':later <br />di suharges . <br />Annual Comprehensive Site Compliance Evaluation <br />The facility operator Shrill conduct 011e cOiiipY.ehensive 'ite <br />compliance evaluation (evaluation) in each reporting <br />period (.July 1 --June 30) . Evaluations shall be conducted <br />withir, P�-16 months of each other, The StNIPPP shall bre <br />revised, as appropriate, and the revisions irnpl_m-,,�ntc-,d <br />within 90 days of the evaluation. Evaluations s} -tall <br />include the following: <br />a. n re 'i E2 V" c,f cin l v i s u a I o1)i e.r%,at10li IF- cords, inSp'ctic7l"i <br />r-ar,, r ?n � rt -t i i r i a rd analysis it ";i)lts <br />��. t� rls,r�l lif'_p t1rn of all tea. ��0111.,ttil+ urc:,s <br />for ?Jide,l. e CI , Gr th pi�tcJltl. l f��2 Poll -Mar" f <br />entering the ci -a n"ig •,stem. <br />C', . A xevi_ew a,1d evaIuatior, of all 11,HPs ( structural_ <br />and non-structural) to determine wh�-ther the BHPs are <br />adenuate, properly implemented and maintained, or <br />whether additional BMPs are needed. A visual <br />inspection of equipment needed to iimplement the SWPPP, <br />such as spill response equipment, shai-1 b- included, <br />d. Esn `valuation report that includes, (i) id_ntificat ic,, <br />of personnel performing the evaluation, iii) the <br />date(s) of the evaluation, (iii) necessary SU7PPP <br />revisions, (iv) schedule, as required in Section <br />A.10.e, for implelitenting SWPPP revisions, ( v ) any <br />incidents of non-con-tpliarice and the corrective actions <br />taken, and (vi) a certification that the facility <br />operator is in Compliance with this General Permit. If <br />the above certification cannot be provided, explain in <br />the evaluation report why the facility operator is not <br />in compliance with this General Permit. The evaluation <br />report shall be submitted as part of the annual report, <br />retained for at least five years, and signed and <br />certified in accordance with Standard Provisions 9. and <br />10. of Section C. of this General Permit. <br />