Laserfiche WebLink
for approval by the Regional Water Board. Facility <br />operators shall continue to comply with the monitoring <br />requirements of this Section; and may not �t a implement n <br />alternative monitoring plan until the alternative monitoring <br />plan is approved by the Regional Water Board. r; 1.f:eEnative <br />monitoring plan_ are subject to modification by the Regional <br />Water Boards. <br />10. Monitorinn Methods <br />a. Facility operators shall_ explain how the facility's <br />monitoring program will satisfy the monitoring program <br />objectives of Section B.2. This shall include: <br />i. Rationale and description of the visual observation <br />methods, location, and frequency. <br />ii. Rationale and description of the sampling methods, <br />ANIL location, and frequency; and <br />iii. Identification of: the analytical methods and <br />corresponding method detection limits used to <br />detect pollutants in storm water discharges. This <br />shall include justification that the method <br />detection limits are adequate to satisfy the <br />objectives of the monitoring program. <br />