Laserfiche WebLink
Water Board or Fegional Water Board, or shall submit their <br />"forma"On On a f'fm that contains equivalent. information. <br />15. Grouu Monitoring <br />Facility Operators may participate in group monitoring as <br />described below. A facility operator that participates in <br />group monitoring shall develop and implement a written site- <br />specific SWPPP and monitoring program in accordance with the <br />General Permit and must satisfy any group monitoring <br />requirements. Group I 0nitn"ing shall be subject to the <br />following requirements: <br />a. A group monitoring <br />p2; -T, (Gi'9P) shall be developed and <br />implemented by a group leader representing a group of <br />"'"al fac i l ty =i erators regulated by this General <br />Permit or: by a local agency which holds an NPDES permit <br />(local agency permittee) for a municipal separate storm <br />sewet syaem. vTPs ;1tr Participants that discharge <br />storm water within the boundaries of a single i egional <br />Water B.)aT r; shall. b e approved J" `I�tRegional . water <br />T^ <br />r <br />Board. GMPv:it participants that discharge <br />storm w;m <br />w_p�1 the _nn reF of multiple Regional Water c,,, a <br />shall b: <br />attT ��hy the totc Water Board. The S <br />_ <br />GaLer Beard ' t <br />Fogional Water Board(s) may disapprove <br />a_ facility's participation in a GHP or require a GM, <br />participant to c i'd',:'_t additional monitoring activities, <br />i> Each G:'tP participant shall collect and analyze sampiet <br />from at least two storm events in accordance with section <br />B 5. over the five-year period of this General Permit. <br />' <br />The two storm event mi nim Am applies to new and existing <br />members. The group- reader or local agency permittee <br />shall schedule sampling to meet the following condition_ <br />(i) to evenly ddstribute the sample collection over the conditions: <br />five--year terra; of this General Permit, and (ii) to <br />collect samples from the two storm events at each <br />participant's fa Kit,,- in different and non --consecutive <br />wet seasons. New participants who join in Years 4 and 5 <br />of this General Permit are not subject to Condition (ii) <br />above. Group leaders shall -explain in the annual Grow <br />Evaluation Report why any scheduled samples were not <br />collected and reschedule the sampling so that all <br />required samples are collected during the term of this <br />General Permit. <br />C. The group leader or local agency permittee must have the <br />appropriate resources to develop and implement the GNP. <br />The e group leader or local agency permittee must also have <br />the authority to terminate any participant who is not <br />complying with this General Permit and the GMP. <br />