Laserfiche WebLink
Consolidated Forward --. Landfill <br />Page 6 <br />grinder/screener have a sufficient moisture content to prevent gemration of visible dust <br />or particulate matter. <br />14 (D,5) <br />Proposed as Part of the Project: <br />Measures that reduce landfill traffic and operations impacts through t use of Best Available <br />Control Methods (BACMs) as defined by the San Joaquin Valley Unified Air Pollution <br />Control District (SJVUAPCD) shall be required to reduce this cumulative impact. <br />15 Austin 1994 (GS, b), Austin 2000 (GS. b) <br />Excessively odorous wastes shall be mixed immediately with other landfall wastes, depending <br />on their nature and source. If diluting the it, tensity of odor is not sufficient, then the operator <br />shall immediately cover offensive materials as soon as they arrive ar the landfall, <br />16 Austin 1994 (GS, c), Austin 2000 (G5. c) <br />The operator shall ensure that loading, unloading, and material hard7ing activities are <br />carried out efficiently and without delays to avoid excessive odors. <br />17 Forward 1993 (DI) <br />C•se water trucks and/or sprinkler systems to apply water a minimum, of twice daily to <br />roadways and active faces of asbestos disposal areas to minimize airborne dust leaving the <br />site. It is recognized that a balance must be smock between maintaining sufficient moisture <br />for dust control and applying too much moisture such that the generarion of excess leachate <br />occurs. The conditions of the active faces of a landfall, as well as the leachate generated, <br />must be monitored and professional judgment utilized at all times to keep these tivo factors ill <br />balance. <br />18 Fonvard 1993 (D2) <br />Portions of the site that either have been filled to the extent allowed or are not expected to be <br />ivorked for extended periods (six months or longer) shall be sown x�h fast -germinating <br />drought -tolerant grass seed and watered until a cover of vegetation is established, <br />19 Austin 1994 (GI.b), Austin 2000 (GI.b) (similar) <br />The project sponsor shall seed to minimize the extent of area exposed to wind erasion. <br />Exposed surfaces, including stockpiles, shall be vegetated to the edeni possible. <br />20 Austin 1994 (GI.c), Austin 2000 (GI.c) <br />Plan and phase construction and closure operations such that they do not take place <br />simultaneously on dry windy days. Schedule particularly dusty actiW ies on separate days. <br />21 Austin 1994 (GL d), Austin 2000 (G].aq <br />Design the site falling plan to facilitate screening of the active face from the prevailing winds, Whenever possible, to minimi=e the amount of windblown dust released from the working <br />(ace. <br />22 Austin 1994 (GI. e), Austin 2000 (GI. e) <br />Haul trucks carrying easily airborne material shall be covered during transport and sprayed <br />with water prior to dumping if u is shown that this would reduce dreg emissions during off- <br />loading activities within the landfill. <br />23 Au0 stin 1994 (GI.j), Austin 2000 (GI fi <br />