Laserfiche WebLink
Consolidated Forward Inc. Landfill <br />Page 7 <br />771e landfill operator shall restrict truck and equipment travel over loose, uncompacted, <br />unpaved surfaces. <br />24 Forward 1993 (D5) <br />A particulate/meteorological monitoring station should be installed on theproject site, <br />preferably near the site bounday with one of the closer residential receptors. This <br />monitoring station should be operational for a minimum of six months during the dry season <br />(April -September) before landfill activity begins to intensify as a result ofproject <br />implementation. Data should be collected daily during this baseline period, during the <br />landfill's transition to higher project -related activity levels, and during the landfill's peak <br />operational phases thereafter. If the more intensive landfill operations are found to <br />increment the 24-hour average of the annual average PM10 levels by more than 5 ug/m3 <br />over baseline, respectively, even with the implementation of all the above-neentioned deist <br />controls, f irther deist control measure and/or limits on the amount of waste received at the <br />site may be necessary to control PM10 impacts. <br />25 Forward 1993 (D6) <br />Forward, Inc. shalt schedule regular deliveries of waste at the landfill to minimise queuing <br />and idling. <br />26 Austin 1994 (GM), Austin 2000 (G2.b) <br />The idling of all internal combustion equipment shall be limited to ten minutes at any given <br />tine. <br />27 Austin 1994 (G2.a), Austin 2000 (G2.a) <br />All internal combustion engine driven equipment should be properly maintained and tuned <br />according to manufacturers specifications. <br />28 Forward 1993 (DS) <br />All VOC-contaminated soil which is not being treated shall be covered with six -mil non- <br />porous plastic. <br />29 Forward 1993 (D9) <br />If VOC emissions exceed APCD limits for open aeration, a VOC collection and removal <br />system shall be installed to minimize VOC emissions. <br />30 Forward 1993 (D10) <br />Any net increase in VOC emissions which remain after the installation of a <br />collection/removal system shall be offset to the degree required by SIVUAPCD Rule 220.1 <br />E. PUBLIC HEALTH AND SAFETY <br />31 (E.1) <br />Proposed as Part of the Project: <br />Use a total of 17 pieces of diesel pottered equipment (at any given time) over the life of the <br />project to minimize particulate discharge. To minimize the risk from particulate—and <br />specifically diesel fumes—The existing 28 pieces of diesel powered landfill operating <br />equipment will be reduced to a total of 17 pieces of equipment over 15 -year or fewer period. <br />Operations at the combined landfill «ill be limited to a single working area at any given time. <br />