Laserfiche WebLink
Consolidated Forward Inc. Landfill <br />Page 13 <br />site. The surface -water collection drain system will be designed to divert the water to the <br />storm water collection basin in the southwest comer of the currem Austin Road Landfill, at <br />times when enough surface water accumulates to have dischareed into the collection basin. <br />All waste at the proposed Fonvard Landfill will be separated from the north and south <br />branches of Littlejohns Creek by a levee system or other acceptable method designed to <br />protect the site from a 100 -year flood event. <br />The project includes channel reconfiguration and localized flood protection berms to isolate <br />the landfill surfaces from floodwaters. <br />The project design also includes provision of replacement floodplain area and storage volume <br />in an easement along the relocated North Branch of the South For'< of South Littlejohns <br />Creek. <br />The channel and floodplain storage easement are designed to ac.-ommodate the 100 -year, 24- <br />hour storm. The design also includes a three-foot freeboard. <br />45 (F.2) <br />Proposed as Part of the Project: <br />The JTD articulates the programs of drainage control structures and monitoring to inhibit <br />erosion and sedimentation. Proposed structural controls include the drainage control system <br />and daily cover. Operational controls include maintenance of the drainage system by keeping <br />ditches clear of debris and excessive vegetation, and making ne-_-AYd repairs to drainage <br />structures. Corrective measures will be implemented if inspections show excessive erosion or <br />JMML damage to drainage channels. Eroded areas will be mitigated by removing loose debris <br />Ipfollowed by replacement, regrading, and compacting the area. Monitoring and protection <br />against sediment from entering the Littlejohns stream channel VWRI be implemented, including <br />the diversion of part of Littlejohns Creek farther away from the landfilled area. <br />In order to minimize sediment transport to the Littlejohns Creek landfill slopes, ridgetops, <br />and peripheral areas will be revegetated to inhibit erosion. <br />46 (F.3) <br />Proposed as Part of the Project: <br />The liner and Jeachate collection system for the expansion sysu= -both over the top of the <br />existing unlined Austin Road landfill and the extension of the existing leachate collection <br />system at Forward— have been designed to meet or exceed the regulatory requirements as <br />shown and discussed in the applicants JTD. The TI'D and the adequacy of the leachate <br />collection system and associated monitoring are under review br- the RWQCB. <br />The regulatory required separation between the liner and groundwater will be implemented to <br />allow for chemicals in the leachate to attenuate before reaching the groundwater, should the <br />leachate breach the collection system. <br />The project design includes a leak detection system under the saps. <br />The liner system will be overlain by a protective operations la•. cr consisting of a one -foot <br />thickness of soil and a one -foot thick gravel layer that serves as the leachate collection layer. <br />This t�vo-foot layer will serve to protect the liner system from slip or jagged materials in the <br />waste. <br />