Laserfiche WebLink
Consolidated Fonvard Inc. t_.andfill <br />Page 17 <br />systems. As part of that plan, grading operations will be scheduled •to avoid the rainy season <br />and be implemented by interim engineering control measures. Before grading is stopped, <br />slopes N�ilf be directed to carry runoff to areas where erosion and sedimentation can be <br />controlled. Truck beds will be hosed down to reduce soil spillage on paved roads and wind- <br />blown dust. Relocation of Littlejohns Creek could lessen the sedimentation potential to the <br />creek. <br />Completed cells will be stabilized by the planting and maintenance of drought -resistant <br />grasses. This will inhibit wind and water erosion and maximize the fertility of the soil in <br />order to facilitate revegetation. <br />Temporary plantings, geofabric drapes, and erosion -preventing diversions of surface water <br />«ill be constructed as appropriate on temporary slopes. <br />Regular operational and post -closure monitoring of erosion control structures and plantings <br />Hill be done for a minimum of five years. <br />59 Forward 1993 (B.5) <br />Assessment of groundsvater levels in monitoring wells shall be initiated within 24 hours <br />follotit-ing an earthquake event having a Modified .titercalli intensity of V or greater at the <br />landfill. This will allow the seater level database to be adjusted or seismic variations. In the <br />event that anomalous water level changes are noted, a series of water quality sampling and <br />testing events shall be initiated by the applicant in coordinarion with the RFVQCB to detect an <br />changes in water quality that may signify subsurface adjustments in landfill cells. <br />Amok <br />60 Fonvard 1993 (B.6) <br />Benchmarks shall be established (these could utilL-e monitoring well top of casing <br />elevations), which will allowfor determinations ofsettlement/consolidation offill materials <br />in closed sections of the landfill on an annual basis and following significant seismic events <br />(,Modified Mercalli Scale of V or above). In the event that changes are noted, the cause <br />should be determined as should the effect on leachate collection and recovery systems. <br />Repair liners and LCRS as necessary, in addition, remedial grading should be accomplished <br />to restore the original cap's function to repel water and direct surface runoff. <br />61(H.2) <br />Identified in This EIR: <br />Night lighting with sodium lamps with sharp cutoff angles shall be used to focus light in <br />active landfill areas (target areas) and to avoid nighttime lighting of adjacent open, areas and <br />trees. <br />62 (H.3) <br />Proposed as Part of the Project: <br />As a participant in the SJCMSCP, Fonvard will incorporate SJCMSCP guidelines developed <br />to minimize effects of rodenticides to the garter snake, the brush rabbit and the Swainson's <br />Hawk (Appendix A of the SJCMSCP). <br />Identified in This EIR: <br />0 <br />