Laserfiche WebLink
Consolidated Forward Landfill Pro ject—Mitigationonitorin Re <br />g and Reporting g Program Checklist Page 38 <br />Mitigation Measure <br />(AB 1760) <br />54 Forward 1993 (0) <br />Secondary containnxent <br />for dieselfuel <br />G. SOILS AND GEOLOGY <br />55 (G.2) Alternative daily cover <br />56 (G.3) Modify seismic design <br />if needed <br />Monitor liner and <br />drainage xystrtn <br />57 (G.4) Seismic design <br />requirements of <br />Title 27 <br />58 (0.5) Implement erosion <br />management plan <br />Revegetttte completed <br />Cells <br />Frosion c01111,01s, on <br />temporary slopes <br />Monitoring of erosion <br />control measures <br />Implementation <br />Tinting: Prior to approval of <br />Solid Waste Facilities Permit (SWFP) <br />Monitoring <br />Environmental ,Health Department <br />Timing: Prior to Approval of <br />Solid Waste Facilities Permit (SWFP) <br />Responsibility: Landfill operator Responsibility. San Joaquin County <br />Tinting: Secondary containment shall be Environmental Health Department <br />shown on Improvement Plan Tinting: During monthly site visits <br />1 <br />Responsibility: Landfill operator <br />Timing: If and as needed <br />Responsibility: Landfill operator <br />Letters from RWQCB and CIWMB <br />approving seismic design shall be <br />included with the Improvement Plan <br />Responsibility: Landfill operator <br />Tinting: As determined by RWQC13 <br />and/or CIWMB <br />Responsibility: CIWMB <br />Timing: If and as needed <br />Responsibility: RWQCB and CIWMB <br />Timing: Prior to issuance of <br />Waste Discharge Requirements (WDRs) <br />Responsibility: RWQCB and CIWMB <br />Tl1ttlrtg: Anm`ally <br />Responsibility: Landfill operator Responsibility: RWQCB and CIWMB <br />Tinning: Letters fiomRWQCB and CIWMB Timing: prior to issuance of <br />approving seismic design shall be Waste Discharge Requirements (WDRs) <br />included with the Improvement Plan and Solid Waste Facilities Permit (SWFP) <br />Responsibility: Landfill operator <br />Timing: Daily <br />Responsibility: Landf111 operator <br />'liming: I )poll completion of each Coll <br />Responsibility: Landfill operator <br />"Timing: Upon construction of <br />temporary slopes <br />Responsibility: Landfill operator <br />Timing: Daily, and for at least <br />Responsibility: RWQCB <br />Timing: Annually <br />Responsibility: ItWQCll <br />Tinting: Annually <br />Responsibility: RWQCI3 <br />Timing: Annually <br />Responsibility: RWQCB <br />Timing: Annually, for at least <br />Ymplementation <br />Confirmation Comments <br />