Laserfiche WebLink
® Consolidated Forward Landfill Project - Mitigation NW ring and Reporting Program Checklist 09 <br />Mitigation Measure <br />59 Forward 1993 (B_S) <br />Assess groundwater <br />level after earthquake <br />Implementation <br />live years eller closure of cells <br />Responsibility: Landfill operator <br />Tinting: Within 24 hours of <br />earthquake of V or greater <br />60 Forward 1993 (B. 6) <br />Benchmarks to monitor <br />Responsibility. Landfill operator <br />settlement <br />Timing: Benchmarks shalt be <br />indicated on improvement Plan; <br />quarterly monitoring <br />IL BIOLOGICAL R17SOURCIS <br />61 (I1.2) Sodium lamps with <br />Responsibility: Landfill operator <br />sharp cutoff angles <br />Timing: The lamp design shall be <br />included in the Improvement Plan <br />Monitoring <br />rive years ufler closure o('cells <br />Responsibility: RWQCB <br />Timing: Within 24 hours of <br />earthquake of V or greater <br />Responsibility: RWQCB <br />Timing. Annually <br />Responsibility: San Joaquin County <br />Community Development Department <br />Timing: Prior to approval of the Improvement <br />Plan <br />62 (H.3) Incorporate guidelines Responsibility: Landfill operator Responsibility: San Joaquin County <br />for rodenticides Timing: Rodenticide guidelines shall be Environmental Health Department <br />included in the Improvement PIan Timing: Prior to approval of the Improvement <br />Plan <br />Review guidelines Responsibility: Landfill operator <br />lirr rodcnticides 'Timing: Biologist's report and <br />recommendations on rodenticides <br />shall be included in the <br />Improvement Plan <br />63 Austin 1994 (/ La, 1'l.h, and Fl.() (vintilar but updated), Austin 2000 (Fl.a) <br />Monitor anel niarntetin Responsibility: Landfill operator <br />Creek realignmenI Timing: Annually, for five years <br />following construction <br />64 Austin 2000 (Fl.c) <br />Monitor riparian Responsibility: Landfill operator <br />vegetation Timing: Annually, forftve years <br />following construction <br />Responsibility: San Joaquin County <br />Hovironntcn(ul Ilcu1(1i Dciutrtment <br />Timing: Prior to upproval of the Improvement <br />Plan <br />Responsihility: U.S. Army Corps <br />of Engineers, CDFG <br />Tinting: Annually, for five years <br />following construction <br />Responsibility. U.S. Army Corps <br />of Engineers. CDFG <br />miming: Annually, for five years <br />Implementation <br />Confirmation Comments <br />