My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2014_8
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2014_8
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 12:38:44 PM
Creation date
7/3/2020 10:58:20 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2014_8
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2014_8.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
595
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Conditions for N-339-17-10 (continued) Page 3 of 9 <br />24. 1 hu fuoility shill install and maintain in prt�)cr opt. -rating condition a gas flow Meter with a continuous recording <br />device which tnza;ures the amount of L-indfill gas consumed in the flares and the amount of landfill gas controlled by <br />the CICS per day, each [District NSR Rule) Federally Enforceable Through Title V Permit <br />25. The flares shall be equipped with a temperature indicator and recorder that measures turd records the operating <br />tcntperuturu. The temperature indicator and r"urder rout operate continuously. [District NSR Rule) Federally <br />i;nforcey'ibleThrougliJ*itic V 1'enuit <br />26. The enclosed flares shall he equipped with automatic dampers, an automatic shutdown device, and a flame arrester. <br />(l)astnet NSR Rule) Federally Enforceable Through Titic V Pemtit <br />27 The enclosed Flares Miall be equipped with an Ll'G or,natural gas tired pilot. [District NSR Rule) Federally <br />En forceable Through Title V 1'etmit <br />28 Source testing on 111c flares shall be perfonned to demonstrate compliance with the NOx and CO limits, and the Vt)C <br />destruction efficiency of 98% or 20 ppmv «3% oxygen (as hexane) as required by this permit shall be conducted <br />annually. [District NSR Rulc] Federally Enforceable Through Title V Permit <br />29. Source testing for NOx shall be conducted using CARR Method 7 or Method 20. [District Rule 10811 Federally <br />Enforceable Through Titic V Permit <br />30. Source testing for CO Miall be conducted using 1 1'A Method 10 or 1013, CARR Methods 1 through 5 with 10, or <br />CARl3 Mctlto<1 100. [District Mule 10B 1] Federally F.rnforccableThrough Title V Pennit <br />31 VOC emissions shall be measured by E11A Method 18, 25, 25A, or 25C. [District lRulc 1081) Federally Enforceable <br />Through Title V Pennit <br />32. H2S eoneentra(ion of the influent landfill gas to the flares shall not exceed 46.9 ppn,v. [District NSR Rule] Federally <br />Euforeenble Through Title V Permit <br />33. Gus combusted in trite flares shall be tested for H2S content on a quarterly basis using draeger tubes. If compliance is <br />shown for two consecutive quarters, the testing frequency may be changed to annual. Quarterly testing shall restune if <br />any annual test shows noncompliance [District Rule 108 11 Federally Enforceable'l-hrough Title V Pennit <br />34 Upon receiving an approval plat, for closure, or partial closure, tlw operator shall modify this operating permit to <br />comply with the requirements of District Rule 4642 (District Mule 4642, 3.2 and 4.1,11 Federally Enforceablc Thruugh <br />Title V Pemtit <br />35. bas collection system shall be operotW in a manner which maximizes the atnount orlanthfin gas extracted while <br />prevurttiug uverdraw that can cause fires or damage the gas collection system. [District NSR Rule] federally <br />Enforceable Through Title V Permit <br />36 During maintenance of the gas collectiou system or incineration device, emissions of landfill gas shall be minimized <br />during shutdown. [District NSR Rule] Federally Enforceable Through Title V Permit <br />37 Maintet►ance is defined as work performed on a gas collection system and/or control device in order to ensure <br />continued compliance with District rules, regulations, and/or Permits to Operate, and to prevent its failure: or <br />malfunction. [District NSR Rule] federally F,rtforccablc Thruugh'f'itle V Permit <br />38 The permittee shat► notify the Al'CC) by telephone at least 24 hours before; performing any maintenance work that <br />requires the system to be shutdown. The notification shall include a description of work, the date work will be <br />performed and the amount of time needed to eompletc the mrintenance work. [District NSR Rule] Federally <br />Enforceable Through Title V Permit <br />39. Permittee shall maintain records of system inspections including: date, time and inspection results. [District Ruh: 1070) <br />Federally En1-otecable TluoughTitle V Permit <br />40 Permittee shall maintain «:cords of maintenance related or othcr collection system and control device downtime, <br />including individual well shutdown. f District Rule 10701 Federally Enforceable Through Title V Permit <br />41. The operator shall rocord emission control device source tests (emissions of CO, NOx, and VOC) in pomids per <br />MMbtu heat input. Operator shall also rccurd VOC destruetinnttr-eatrnent efficiency. [District Rule 1081) Federally <br />F,ntorceable Through Title V Permit <br />CONDMONS CONTINUE ON NEXTPAVE <br />
The URL can be used to link to this page
Your browser does not support the video tag.