Laserfiche WebLink
Conditions for N-339.17-10 (continued) Page 4 of g <br />0 42 Annual amount of soil used for intennediatc and final covering slia)l not exceed 1,406,827 cubic yar(L; of soil, atilt <br />I'M 10 emissions shall nal exceed O.WS lb PM I0/ton of soil (using x suit density of 3,240 lbs/cubic yard of soil). <br />Permittee shall keep annual records of the amount of soil used for intermediate and final covering (District NSR Rule] <br />Federally Enforceable Through Title V PLR -nit <br />43. Permittee shall maintain daily and annual records of landfill gas flow rate to the flares. [Di;trici Rule 10701 Fedcrally <br />Enforceable Tluough Title V Permit <br />44. All records shall be retained for a period of at least 5 years and shall be made available for District inspection upon <br />request. (District Rule 1070] Federally Enforceable Through Title V Permit <br />45. A record of continuous flare combustion temperatw-e, continuous volumetric gas flow rate; net healing vuluc of Lindh ll <br />gas being combusted, daily average fuel consumption, daily average heat hipm, and carbon canister inspection shall be <br />maintained, retained on the premises fora period of at least five years and made readily availublc for District <br />inspectiou upon request. (District NSR Rule] Federally Fn forecablc'lluough -1 itle V Permit <br />46 This operoling permit may be canccllcd with APCO approval when the landfill is closed, pursuant to the requirements <br />Of this permit, if the landfill is not otherwise subject to the requirements of either 40 CFR part 70 or part 71 and if <br />either 1) it was never subject to the requirement for a control system under 40 CFR 60.752(6)(2); or 2) the owner or <br />operator meets the conditions for control system removal specified in 40 CFR 60,752(b)(2)(v). [40 CFR 60.752(d)] <br />Federally Frifurncahlc 'Through Title V Pen -nit <br />47. if the landfill is pcntianently closed, a closure notification shall he submitted to the APCO within 30 days of w;tstc <br />disposal cessation. A permanent closure must take place in accordance with 40 CFR 258.60. if a closure report bas <br />been submitted, no additional waste may iae placed in the landfill without tiling a notification of modification to the <br />APCO, pursu;tnt to 40 CFR 60.7(a)(4). [40 CFk 60.752(b)(l )(ii)(B), 60.757(d)] <br />48 An active collection system shall be designed to htindlc the maximum expected gas flow rate front the entire arca of <br />the fandtitl that warranls control over the intended use period of the gas control or treatment system equipment, collect <br />has from each arca, cell, or group of cells in the landfill in which the initial solid waste has hent placed for a period of <br />5 years or more if active; or 2 years or more if closed or at final grade, collect gas at a sufficient extraction rate, and he <br />AWL designed to minimize off-site migration ofsubsurfacc gas. (40 CFR 60.752(b)(2)(ii)(A)] Federally P.nti)rceable <br />JW Through Title V Permit <br />49, All collected 9* s shall be routed to a control systeni designed and operated to reduce the NMOC by 98 weight percent <br />or reduce the nutlet NMOC concentration to less than 20 parts per million by volume, dry basis as hexane at 3 percent <br />oxygen. The reduction efficiency shall be established by all initial performance tut to be completed no later than I g0 <br />days after the initial Startup of the approved control system using the test metliods specified in Section 60.754(d). [40 <br />CFR 60.752(6}(2)(tit)(T3}} Federally £nforceableThrough Title V Permit <br />50 Permittee shall operate the collection system so that the methene concentration is less than 500 parts per million above <br />background at the surface of the landfill. To determine if this level is excecdcd, the owner or operator shall conduct <br />surface testing around the perimeter oftltc collection area and along a pattern that "verses the landfill at 30 meter <br />intervals and where visual observations indicate elevated concentrations of landfill gas, such as distressed vegetation <br />and cracks or seeps in the cover, The owner or operator tray establish an alteniative traversing pattern that ensures <br />equivalent coverage. A surface monitoring design plan shall be developed that includes a topographical map with the <br />monitoring route and the rationale for any site-specific deviations from the 30 meter intervals. Areas widi steep slopes <br />of other dangerous areas may he excluded from the surface testing 140 CFR 60.753(d)] Federally Enforceable <br />Through Title V Permit <br />51. Compliance with this surface methane operational standard shall be demonsrratcd using the procedures outlined in 40 <br />CFR 60.755(e) within 180 days of installation and startup of the collection and control system and quarterly thercafter. <br />(40 CFR 60.753(d), 40 CFR 60.755(c), and 40 CFR 60.91 Federally Enforceable Through Title v Perritt <br />52. Pcnniucc shall operate the enclosed flan at all times when the collected gas is routed to it. [40 CFR 60.753(01 <br />federally Enforceable Through Title V Permit <br />53 Permittee sh;111 operate the landfill gas collection system such that gas is collecled from each area, cell, or group of <br />cells in the MSW landfill in which solid waste has been in place for: (i ) five years or more il'netive; or (2) two years <br />or more if closed or at final grade. [40 CPR 60.753(a)] Federally Enforceable Through Title V Permit <br />CONDMONS CONT NIM ON NEXT PAGE <br />