Laserfiche WebLink
WASTE DISCHARGE REQUIREMENTS ORDER NO. R5-2014-0006 -29- <br /> FORWARD INC.AND REPUBLIC SERVICES INC. <br /> FORWARD CLASS II LANDFILL <br /> SAN JOAQUIN COUNTY <br /> 14.Cannery rinsate mud discharged for air drying on a clay pad constructed over a lined <br /> WMU shall be dried and moved to an active WMU within five days. <br /> 15.The Discharger shall operate the Groundwater Treatment Facility in compliance with <br /> Waste Discharge Requirements Order No. R5-2003-0080 or any subsequent Orders <br /> adopted by the Central Valley Water Board. <br /> 16.The Discharger may not use any material as alternative daily cover (ADC) that is not <br /> listed as approved ADC in the Findings of these WDRs unless and until the <br /> Discharger has demonstrates it meets the requirements in Title 27, section 20705, <br /> and the Discharger has received approval that it may begin using the material as ADC. <br /> 17.The Discharger shall use approved ADC only in internal areas of the landfill that do <br /> not drain outside of the limits of the contiguous landfill units unless the Discharger <br /> demonstrates that runoff from the particular ADC is not a threat to surface water <br /> quality and the demonstration has been approved. This demonstration may take <br /> removal of sediment or suspended solids into account for landfills where surface water <br /> drains to a sedimentation basin. <br /> 18.The Discharger shall, in a timely manner, remove and relocate any wastes discharged <br /> at this facility in violation of this Order. If the Discharger is unable to remove and <br /> relocate the waste, the Discharger shall submit a report to the Central Valley Water <br /> Board explaining how the discharge occurred, why the waste cannot be removed, and <br /> any updates to the waste acceptance program necessary to prevent re-occurrence. If <br /> the waste is a hazardous waste, the Discharger shall immediately notify the <br /> Department of Toxic Substances Control. <br /> 19.The Discharger shall comply with all Standard Discharge Specifications listed in <br /> Section D of the SPRRs dated January 2012 which are attached hereto and made <br /> part of this Order by reference. <br /> C. FACILITY SPECIFICATIONS <br /> 1. The Discharger shall comply with all Standard Facility Specifications listed in <br /> Section E of the SPRRs dated January 2012 which are part of this Order. <br /> 2. Soil in the upper one foot of the composting pad and compost storage pad areas shall <br /> be tested and if necessary conditioned and compacted to achieve 1 X 10-5 cm/sec <br /> vertical hydraulic conductivity. <br /> 3. The composting pad and compost storage pad areas shall be maintained to minimize <br /> the downward percolation of applied, produced, and precipitated wasters by a <br /> combination of the following factors: <br /> a. The depth, composition and degree of compaction of the pad; <br />