My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2014_8
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2014_8
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 12:38:44 PM
Creation date
7/3/2020 10:58:20 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2014_8
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2014_8.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
595
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WASTE DISCHARGE REQUIREMENTS ORDER NO. R5-2014-0006 -30- <br /> FORWARD INC.AND REPUBLIC SERVICES INC. <br /> FORWARD CLASS II LANDFILL <br /> SAN JOAQUIN COUNTY <br /> b. Judicious use of applied water to control dust and facilitate continued compaction <br /> of the pad areas; <br /> c. Shifting the location of the compost and storage piles, at least annually, to facilitate <br /> and maintain compaction; <br /> d. Limiting applied water to minimize production and drainage of leachate; <br /> e. Assuring that no compost pile, feedstock pile, or additive pile produces free <br /> drainage (i.e., releases leachate); and <br /> f. Other effective measures proposed by the Discharger. <br /> 4. Compost Facility run-on and run-off controls: <br /> a. Compost Facility shall implement storm water BMPs so that run-off water does not <br /> adversely affect the beneficial uses of any downstream water body; <br /> b. The Discharger shall monitor leachate and water in the retention basin as required <br /> by MRP R5-2014-0006' <br /> c. The retention basin shall be equipped with a synthetic liner, shall maintain a <br /> minimum two feet of freeboard and shall be designed and operated to minimize the <br /> downward percolation of constituents; <br /> d. The Compost and Compost storage pads shall be designed, constructed and <br /> maintained to prevent to the greatest extent possible, ponding, infiltration, <br /> inundation, erosion, slope failure, and washout; <br /> e. The pad or pads shall have a minimum one percent slope; <br /> f. The Discharger shall maintain an effective run-on control system and for the <br /> composting area a run-off control system designed to withstand the maximum <br /> peak flow from a 25-year, 10-minute storm; and <br /> g. The retention basin shall be designed to accommodate all runoff and direct <br /> precipitation from a 25-year, 24-hour storm and maintain two feet of freeboard. <br /> 5. The Discharger shall maintain a 50-foot setback between land application areas and <br /> all natural occurring water bodies. <br /> 6. Land application areas shall be at least 1,000 feet from a domestic water supply well. <br /> 7. Staging or storage of food processing residuals on the ground in any area not <br /> equipped the means to prevent leachate infiltration is prohibited. <br />
The URL can be used to link to this page
Your browser does not support the video tag.