Laserfiche WebLink
WASTE DISCHARGE REQUIREMENTS ORDER NO. R5-2014-0006 -33- <br /> FORWARD INC.AND REPUBLIC SERVICES INC. <br /> FORWARD CLASS II LANDFILL <br /> SAN JOAQUIN COUNTY <br /> 2) a Geosynethic Clay layer: <br /> 3) a 60-mil HDPE geomembrane; <br /> 4) a geonet LCRS layer; and <br /> 5) a 60-mil HDPE geomembrane. <br /> 4. The Discharger shall not proceed with construction until the construction plans, <br /> specifications, and all applicable construction quality assurance plans have been <br /> approved. <br /> 5. The Discharger may propose changes to the liner system design prior to construction, <br /> provided that approved components are not eliminated, the engineering properties of <br /> the components are not substantially reduced, and the proposed liner system results <br /> in the protection of water quality equal to or greater than the design prescribed by <br /> Title 27 and this Order. The proposed changes may be made following approval by <br /> the Executive Officer. Substantive changes to the design require reevaluation as an <br /> engineered alternative and approval by the Central Valley Water Board in revised <br /> WDRs. <br /> 6. The Discharger shall comply with all Standard Construction Specifications listed in <br /> Section F of the SPRRs dated January 2012 which are attached hereto and made part <br /> of this Order by reference. <br /> 7. The Discharger shall comply with all Storm Water Provisions listed in Section L of the <br /> SPRRs dated January 2012 which are attached hereto and made part of this Order by <br /> reference. <br /> E. CLOSURE AND POST-CLOSURE MAINTENANCE SPECIFICATIONS <br /> 1. The Discharger shall submit a final or partial final closure and post-closure <br /> maintenance plan at least two years prior to proposed closure of any portion of the <br /> landfill in accordance with requirements in Section G of the Standard Closure and <br /> Post-Closure Specifications in the SPRRs. <br /> 2. The Discharger shall close landfill units with a final cover as proposed in the 2005, <br /> Alternative Final Cover Design Report and as approved by this Order. The <br /> components of the approved final cover as proposed in The Final Cover System shall <br /> be comprised, in ascending order, <br /> 1) Minimum one-foot thick foundation layer (in most cases the existing interim <br /> cover) cleared, grubbed and compacted; <br /> 0 2) minimum three-feet thick evapotranspiration layer, with minimum of 70% <br /> passing No. 200 sieve; an as-built saturated hydraulic conductivity of less than <br />