My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2014_8
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2014_8
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 12:38:44 PM
Creation date
7/3/2020 10:58:20 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2014_8
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2014_8.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
595
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WASTE DISCHARGE REQUIREMENTS ORDER NO. R5-2014-0006 _32_ <br /> FORWARD INC.AND REPUBLIC SERVICES INC. <br /> FORWARD CLASS II LANDFILL <br /> SAN JOAQUIN COUNTY <br /> 3) a 60-mil HDPE geomembrane, overlain by a 12-ounce/sq. yard cushion <br /> geotextile (may be omitted if LCRS gravel is sub-angular to rounded); <br /> 4) a 12-inch LCRS gravel drainage layer overlain by an 8-ounce/Sq. yard <br /> separator geotextile; and <br /> 5) a 12-inch thick protective soil operations layer. <br /> b. An engineered alternative composite side slope liner system that is comprised, in <br /> ascending order, of the following: <br /> 1) Prepared subgrade of graded and compacted, fine grained native soil; <br /> 2) a (GCL) or 24-inch thick low permeability soil layer (minimum permeability 1 X <br /> 10-7 cm/sec;) <br /> 3) a 60-mil HDPE liner (single sided textured, textured side down); <br /> 4) a geocomposite drainage net; and <br /> 5) a 12-inch thick protective soil operations layer. <br /> 2. An Intermediate Liner System shall be constructed over the south slope of the existing <br /> Class III Waste Management Cell at Austin Road Landfill. The Intermediate Liner <br /> system will be constructed on top of the existing interim cover and will separate the <br /> existing Class III waste in Austin Road Landfill from new Class III waste. The <br /> Intermediate Liner System shall be comprised, in ascending order, of the following: <br /> 1) One-foot of existing refuse cover soil; <br /> 2) one-foot of additional foundation soil; <br /> 3) a 24-inch thick low permeability soil layer (minimum permeability of 1 X 10-7 <br /> cm/sec) or GCL liner; <br /> 4) a 60-mil HDPE geomembrane (textured); <br /> 5) drainage geocomposite; and <br /> 6) a 12-inch thick protective soil operations layer. <br /> 3. The Discharger shall construct the liner of any new Class II surface impoundment <br /> units as described in Finding 6 of this Order in accordance with the following approved <br /> prescriptive liner: <br /> 1) Prepared subgrade of graded and compacted, native soil; <br />
The URL can be used to link to this page
Your browser does not support the video tag.