Laserfiche WebLink
MONITORING AND REPORTING PROGRAM NO. R5-2014-0006 16 <br /> FORWARD INC.AND REPUBLIC SERVICES INC. <br /> FORWARD CLASS II LANDFILL <br /> SAN JOAQUIN COUNTY <br /> contours, and include a projection of the year in which each discrete landfill <br /> module will be filled. <br /> g) A written summary of the monitoring results, indicating any changes made or <br /> observed since the previous Annual Monitoring Report. <br /> h) The results of the annual testing of leachate collection and removal systems <br /> required under Standard Facility Specification E.14 of the SPRRs. <br /> i) Updated concentration limits for each monitoring parameter at each monitoring <br /> well based on the new data set. <br /> j) A comprehensive discussion of any Corrective Action Program required by this <br /> MRP under Section A.6. <br /> 3) Seep Reporting: The Discharger shall report by telephone any seepage from the <br /> disposal area immediately after it is discovered. A written report shall be filed with the <br /> Central Valley Water Board within seven days, containing at least the following <br /> information: <br /> a) A map showing the location(s) of seepage; <br /> Alk b) An estimate of the flow rate; <br /> c) A description of the nature of the discharge (e.g., all pertinent observations <br /> and analyses); <br /> d) Verification that samples have been submitted for analyses of the Field <br /> Parameters and Monitoring Parameters listed in Table III of this MRP, and an <br /> estimated date that the results will be submitted to the Central Valley Water <br /> Board; and <br /> e) Corrective measures underway or proposed, and corresponding time <br /> schedule. <br /> 4) Annual Facility Inspection Reporting: By 15 November of each year, the <br /> Discharger shall submit a report describing the results of the inspection and the repair <br /> measures implemented, preparations for winter, and include photographs of any problem <br /> areas and the repairs. Refer to Section A.5.a of this MRP, above. <br /> 5) Annual Corrective Action Evaluation Report: By 31 July each year, the Discharger <br /> shall submit an Annual Corrective Action Evaluation Report that includes at least the <br /> following: <br /> a. A comparison of the site-wide Total VOC (TVOC) mass from the past four <br /> quarters to the TVOC mass threshold limit; <br /> b. a screening of the site-wide TVOC mass from the previous four quarters; <br />