Laserfiche WebLink
0 <br />3.11 SITE SECURITY <br />The Forward Landfill is currently equipped with a perimeter fence, gates, locks <br />and signs. The fencing and locked gates restrict access by persons and vehicles <br />other than those authorized. <br />3.12 STRUCTURE REMOVAL/DECOMMISSIONING OF ENVIRONMENTAL <br />CONTROL SYSTEMS <br />At this time, there are no plans to decommission any structures or environmental <br />control systems at the Forward Landfill during the closure of Stage IA. If deemed <br />necessary, any decommissioning of boreholes, monitoring wells or peizometers <br />will be conducted in accordance with the appropriate regulatory agency <br />requirements (including notifications, as required) and in general accordance <br />with post -closure maintenance plan procedures. <br />• • <br />Is <br />3.13.1 CLOSURE PROCESS <br />As discussed in Section 1.5, Stage IA of the Forward Landfill will be closed in <br />Summer 2005. Stage IA closure construction will begin with mobilization of <br />equipment and materials. The type of equipment and required personnel <br />expected to be utilized during closure construction includes but is not limited to, <br />the following: <br />• Equipment <br />- Scrapers <br />- Dozers <br />- Loaders <br />- Compactors <br />- Trucks <br />- Soil Screening Equipment <br />- Motor Grader <br />- Water Truck <br />• Personnel <br />- Construction Manager <br />- Field Inspector(s) <br />- Engineer(s) <br />- Geotechnical Engineer/Geologist <br />Forward Landfill PFCPCMP 3-16 <br />):\Allied\Forward\2005.0051 Partial Closure\Partial Closure Plan\FL-sec3.doc: 6/15/2005 <br />