Laserfiche WebLink
0 Survey Control <br />C7 <br />The survey control crew, under the direction of the contractor will be <br />responsible for surveyed location of the closure plan improvements and for <br />record drawing information. They will be responsible for establishing survey <br />control to verify that the various components of the cover conform to grade <br />and/or thickness requirements of the construction drawings and specifications. <br />CQA For Final Cover Placement <br />The construction specifications will include the CQA Plan for final cover <br />placement. A geotechnical CQA crew, under the direction of a Geotechnical <br />Engineer, will be on-site full-time during the placement of the final cover to <br />monitor compliance with cover design and installation methods included in the <br />CQA Plan. The CQA personnel will have day-to-day responsibility to oversee <br />cover placement and to evaluate whether the cover is constructed according to <br />specifications. <br />Forward Landfill PFCPCMP 3-18 <br />):\Allied\Forward\2005.0051 Partial Closure\Partial Closure Plan\FL-sec3.doc: 6/15/2005 <br />