Laserfiche WebLink
• If the emergency is due to a flood that is from a 100-year/24-hour storm <br />event or less, this is an indication that the drainage and flood protection <br />design for the facility may be inadequate. A design review shall be <br />performed and, if appropriate, all necessary modifications to drainage and <br />flood protection facilities will be made. <br />5.7 EARTHQUAKE <br />The following procedures will be performed following an earthquake incident: <br />• Employees driving in the field during an earthquake should stop their vehicle <br />and get out, if it can be done in a safe manner. <br />• After the earthquake has subsided, site personnel shall report to the site <br />entrance gate for a roll call. If medical care is required, the procedures in <br />Section 5.10 shall be followed. An inspection of the site shall then be made <br />and a report given to the SSO. <br />• Cracks observed in the final cover after an earthquake should be inspected <br />with a combustible gas analyzer. The location of venting and the gas <br />concentrations will be determined and reported to the SSO. Excavation and <br />refill of the smaller surface cracks can be completed immediately. More <br />extensive corrective actions will be authorized by the Site Engineer in <br />accordance with the CQA Plan included in Appendix C of Appendix A. <br />• If a slope fails due to an earthquake, a design review shall be performed for <br />conformance with design standards established at closure and, if appropriate, <br />all necessary modifications to the landfill's slope design will be made. <br />5.8 SURFACE DRAINAGE PROBLEMS <br />In the event of a surface drainage problem, the following procedures shall be <br />followed: <br />• The operator will investigate the problem and determine a necessary course <br />of action. <br />• If a surface inlet is blocked with debris, all necessary labor forces and <br />equipment will be implemented under the direction of the operator to <br />remove the blockage. <br />• If a storm drain is damaged, a plan will be provided by the Site Engineer to <br />repair the problem. <br />• After the drainage problem is corrected, an assessment of possible damage <br />0 or erosion will be conducted and all necessary repairs will be made to meet <br />Forward Landfill FPCPCMP 5-4 <br />J:\Allied\Forward\2005.0051 Partial Closure\Partial Closure Plan\FL•sec 5.doc: 6/15/2005 <br />