Laserfiche WebLink
STAGE IA PARTIAL FINAL CLOSURE AND <br /> POST-CLOSURE MAINTENANCE PLAN <br /> FOR THE <br /> FORWARD LANDFILL <br /> TABLE OF CONTENTS <br /> SECTION PAGE <br /> 3.2.2 Final Cover Construction 3-4 <br /> 3.2.3 Final Cover Transitions 3-6 <br /> 3.2.4 Sources of Cover Material 3-6 <br /> 3.2.5 Final Cover Construction Quality Assurance 3-6 <br /> 3.3 Final Grading 3-6 <br /> 3.4 Landfill Settlement 3-7 <br /> 3.4.1 Settlement Analysis 3-7 <br /> 3.4.2 Survey/Settlement Monumentation 3-8 <br /> 3.5 Landfill Slope Stability 3-9 <br /> 3.6 Drainage and Erosion Control 3-10 <br /> 3.6.1 Drainage Control System Design 3-10 <br /> 3.6.1.1 Hydrology 3-11 <br /> 3.6.1.2 Proposed Final Drainage Control System 3-11 <br /> 3.6.2 Soil Loss Analysis 3-12 <br /> 3.6.3 Erosion Control 3-13 <br /> 3.7 French Drain Liquid Seep Collectors 3-13 <br /> 3.8 Landfill Gas Control 3-14 <br /> 3.9 Landfill Gas Monitoring System 3-15 <br /> 3.10 Groundwater/Surface Water Monitoring System 3-15 <br /> 3.11 Site Security 3-16 <br /> 3.12 Structure Removal/Decommissioning of Environmental <br /> Control Systems 3-16 <br /> 3.13 Closure Implementation Schedule 3-16 <br /> 3.13.1 Closure Process 3-16 <br /> 3.13.2 Construction Schedule 3-17 <br /> 3.13.3 Construction Management 3-17 <br /> 4.0 POST-CLOSURE MAINTENANCE PLAN 4-1 <br /> 4.1 Introduction 4-1 <br /> 4.2 Final Cover Maintenance 4-1 <br /> Forward Landfill PFCPCMP it <br /> ):\Allied\Forward\2005.0051 Partial Closure\Partial Closure Plan\FL-Toc.Doc:06/15/05 <br />