Laserfiche WebLink
STAGE IA PARTIAL FINAL CLOSURE AND <br /> POST-CLOSURE MAINTENANCE PLAN <br /> FOR THE <br /> FORWARD LANDFILL <br /> TABLE OF CONTENTS <br /> SECTION PAGE <br /> 4.3 Drainage System Maintenance 4-2 <br /> 4.4 Vegetative Cover Maintenance 4-2 <br /> 4.5 French Drain Liquid Seep Collector Maintenance 4-2 <br /> 4.6 Bench Maintenance 4-3 <br /> 4.7 Landfill Settlement Monitoring and Monument Maintenance 4-3 <br /> 4.7.1 Survey Record 4-3 <br /> 4.7.2 Survey/Settlement Monuments 4-3 <br /> 5.0 POST-CLOSURE EMERGENCY RESPONSE PLAN 5-1 <br /> 5.1 Purpose and Scope 5-1 <br /> 5.2 Site Safety Officer 5-1 <br /> 5.3 Emergency Response Notification Procedure 5-1 <br /> 5.4 Emergency Response Procedures 5-2 <br /> 5.5 Fire and/or Explosions 5-3 <br /> 5.6 Flood 5-3 <br /> 5.7 Earthquake 5-4 <br /> 5.8 Surface Drainage Problems 5-4 <br /> 5.9 Vandalism 5-5 <br /> 5.10 Underground Fires 5-5 <br /> 5.11 Emergency Response Plan Orientation 5-5 <br /> 5.12 Evacuation Procedures 5-6 <br /> 5.13 Medical Care Procedures 5-6 <br /> 5.14 Amendments to the Emergency Response Plan 5-6 <br /> 6.0 CLOSURE/POST-CLOSURE MAINTENANCE COST ESTIMATE 6-1 <br /> 6.1 Introduction 6-1 <br /> 6.2 Closure Cost Estimate 6-1 <br /> 6.2.1 Final Cover 6-1 <br /> 6.2.1.1 Final Cover Construction Quality Assurance <br /> Monitoring and Testing 6-1 <br /> 6.2.2 Drainage Control System 6-2 <br /> 6.2.3 Erosion Control 6-2 <br /> 6.2.4 Landfill Gas Control System 6-2 <br /> Forward Landfill PFCPCMP III <br /> J:\Allied\Forward\2005.0051 Partial Closure\Partial Closure Plan\FL-Toc.Doc:06/15/05 <br />