Laserfiche WebLink
• Establish understandings between emergency response teams, emergency <br />response contractors, and equipment suppliers for smooth coordination of <br />emergency response actions. <br />During and/or after an incident, the SSO in consultation with other emergency <br />personnel, such as the Fire Department, will assess the potential for injury to any <br />persons located on adjacent properties. If the assessment concludes that an <br />imminent threat to public health is possible, an evacuation of the nearby area <br />will be initiated. Situations, which warrant partial or complete evacuation of site <br />personnel and/or local residents, are as follows: <br />• Explosions resulting in airborne debris including particles and large fragments. <br />• Fires that cannot be readily contained or are spreading to other parts of the <br />facility; or when fire could generate highly toxic fumes, or create a danger of <br />igniting potentially explosive substances which may be stored on-site. <br />The SSO will immediately notify the responding Police/Sheriff Department and <br />all other appropriate emergency response agencies. The SSO will check that the <br />entrance gate is unlocked and locked as required. <br />5.13 MEDICAL CARE PROCEDURES <br />Should an emergency situation result in personal injury, immediate steps will be <br />taken to determine the cause and extent of the injury and to render first aid. The <br />SSO will be notified in all cases and the paramedics will be called when <br />required. If further medical attention is necessary, the injured person will be <br />transported to the nearest medical facility. <br />5.14 AMENDMENTS TO THE EMERGENCY RESPONSE PLAN <br />The ERP will be reviewed and can be amended, in accordance with the criteria <br />listed in 27 CCR, Section 21130(c). The amendment criteria are as follows: <br />• A failure or release occurs for which the plan did not provide an appropriate <br />response. <br />• The post -closure use and/or structures on the site change and these changes <br />are not addressed in the existing plan. <br />Forward Landfill FPCPCMP 5-6 <br />J:\Allied\Forward\2005.0051 Partial Closure\Partial Closure Plan\FL-sec 5.doc: 6/9/2005 <br />