Laserfiche WebLink
STAGE IA PARTIAL FINAL CLOSURE AND <br /> POST-CLOSURE MAINTENANCE PLAN <br /> FOR THE <br /> FORWARD LANDFILL <br /> TABLE OF CONTENTS <br /> LIST OF TABLES <br /> Table 1 Existing/Proposed Groundwater Monitoring Well Network <br /> Table 2 Groundwater Analytical Parameters and Methods <br /> Table 3 Vadose Zone and Surface Water Monitoring Network <br /> Table 4 Landscape Seed Mix <br /> Table 5 Closure Implementation Schedule <br /> Table 6 Closure Cost Estimate Summary <br /> Table 7 Cost Disbursement Schedule <br /> Table 8 Annual Post-Closure Maintenance and Monitoring Cost Estimate Summary <br /> LIST OF FIGURES <br /> Figure 1 Closure Stages Plan <br /> Figure 2 Adjacent Land Uses <br /> Figure 3 Gas System Plan <br /> Figure 4 Groundwater, Surface Water, Lysimeter Monitoring Locations <br /> LIST OF APPENDICES <br /> Appendix A Alternative Final Cover Evaluation <br /> Appendix B Settlement Analysis <br /> Appendix C Slope Stability Analysis <br /> Appendix D Hydrology <br /> Appendix E Downdrain Hydraulic Calculations <br /> Appendix F Soil Loss Analysis <br /> LIST OF DRAWING SHEETS <br /> Drawing 1 Title Sheet <br /> Drawing 2 Site and Index Map <br /> Drawing 3 Closure Grading Plan <br /> Drawing 4 Closure Grading Plan <br /> Drawing 5 Closure Grading Plan <br /> Drawing 6 Closure Grading Plan <br /> Drawing 7 Closure Grading Plan <br /> Forward Landfill PFCPCMP v <br /> ):\Allied\Forward\2005.0051 Partial Closure\Partial Closure Plan\FL-Toc.Doc:06/15/05 <br />