Laserfiche WebLink
STAGE IA PARTIAL FINAL CLOSURE AND <br /> POST-CLOSURE MAINTENANCE PLAN <br /> FOR THE <br /> FORWARD LANDFILL <br /> TABLE OF CONTENTS <br /> SECTION PAGE <br /> 6.2.5 Landfill Gas Monitoring System 6-2 <br /> 6.2.6 Groundwater Monitoring System 6-2 <br /> 6.2.7 French Drain Leachate Seep Collectors 6-2 <br /> 6.2.8 Site Security/Signage 6-2 <br /> 6.2.9 Structure Removal/Decommissioning of <br /> Environmental Control Systems 6-3 <br /> 6.2.10 Engineering Design 6-3 <br /> 6.2.11 Construction Management 6-3 <br /> 6.2.12 Contingency 6-3 <br /> 6.3 Disbursement of Funds 6-3 <br /> 6.4 Post-Closure Maintenance Cost Estimate 6-4 <br /> 6.5 Demonstration of Financial Responsibility 6-5 <br /> 7.0 PROFESSIONAL CERTIFICATION OF ACCURACY 7-1 <br /> 8.0 RECORDKEEPING 8-1 <br /> 8.1 Operating Record 8-1 <br /> 8.2 Location and Inspection of Operating Records 8-1 <br /> 9.0 REFERENCES 9-1 <br /> Forward Landfill PFCPCMP Iv <br /> J:\Allied\Forward\2005.0051 Partial Closure\Partial Closure Plan\FL-Toc.Doc:06/15/05 <br />