Laserfiche WebLink
Proposed 320-acre Site Location ( cont 'd) <br /> materials such as cannery waste. <br /> The estimated cost of a Geotechnical Investigation is from <br /> $16, 000 to $20, 000. <br /> The estimated capacity of Site 90A" may be computed on the <br /> basis of a 65% usable area factor - <br /> 320 acres x . 65 = 208 usable acres <br /> An in-place-density may be assumed of 800 lb . per cubic <br /> yard. <br /> On the basis of a 20-foot depth of fill, the capacity would <br /> be - 43560 = 1, 600 C.Y. acre foot <br /> 27 <br /> 1600 x 800 _ 640 tons per acre foot <br /> 2000 - <br /> 640 x 20 x 208 = 2,662,400 tons capacity <br /> The present estimated daily tonnage being 230 - <br /> 230 x 365 days = 83, 950 tons per year <br /> 2662400 = 30 years , under conditions of the <br /> 383950 950 <br /> present daily loading. <br /> The 320-acre site should suffice for the North Service Area <br /> as certainly the present daily tonnage will decrease with the <br /> advent of a possible new site near the City of Stockton. Under <br /> the conditions of optimum densities by the use of high compactive <br /> compactors and optimum moisture conditions , it is possible to <br /> further extend the usable life of the above proposed site as <br /> densities of 1000# to 1200# per cubic yard will be possible. <br /> In addition to the actual land cost there will be certain <br /> land development cost . <br /> It may also be desirable to have a resident landfill operator <br /> at the site to insure security of site and equipment ' as well as <br /> - 21 - <br />