My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1987-2006
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
17720
>
4400 - Solid Waste Program
>
PR0440058
>
COMPLIANCE INFO_1987-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2023 1:20:24 PM
Creation date
7/3/2020 11:00:39 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
1987-2006
RECORD_ID
PR0440058
PE
4433
FACILITY_ID
FA0004518
FACILITY_NAME
NORTH COUNTY LANDFILL
STREET_NUMBER
17720
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06512004
CURRENT_STATUS
01
SITE_LOCATION
17720 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440058_17720 E HARNEY_1987-2006.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
495
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br /> STATE OF CALIFORNIA California Integrated Waste <br /> CIWMB 03 (Rev. 4/04) Management Board <br /> INSPECTION REPORT ADDENDUM PAGE 3 OF 3 <br /> AGENCY CONDUCTING INSPECTION: San Joaquin County Environmental Health Department <br /> SITE NUMBER: 39-AA-0022 INSPECTOR: Frank Girardi <br /> SITE NAME: North County Landfill <br /> RECEIVED BY <br /> INSPECTION DATE: 06/21/06 OPERATOR <br /> COMMENTS: <br /> 7. Note T27 CCR—Beneficial Reuse 20686(c)-Woodwaste currently being stockpiled at module 3 at south slope to be <br /> compacted for winter pad(instead of being stockpiled at designated storage cement area). At time of inspection,no <br /> woodwaste was stored at designated woodwaste storage area as indicated JTD dated March 4,2005. <br /> a. A winterization plan has not been submitted to the EHD. Submit to the EHD a winterization plan. The plan shall <br /> include location,site map,and timelines for construction of winter pad(s). <br /> 8. Notes: <br /> A. Previous torn tarps(Auto tarps)have been repaired. <br /> B. Erosion channels have been repaired(previous AC cleared). <br /> C. Small erosion channels in lift in module 4(facing south)have been repaired. <br /> D. Construction of gas extraction system is in progress. <br /> E. Facility began operation after 7 AM in accordance with permitted hours of operation as specified in SWFP. <br /> F. Gas probes measured were less than 5%methane by volume of air. <br /> G. Vegetation and grasses along site boundary has been cleared away. <br /> H. Grading of ponding areas has been completed at deck for old modules(modules I and 2). <br /> I. No odors observed at Fusion Well#3 (at module 3). Area has been filled-in/sealed with dirt. <br /> INSPECTOR SIGNATURE: DATE: <br />
The URL can be used to link to this page
Your browser does not support the video tag.