My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_1988
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
17720
>
4400 - Solid Waste Program
>
PR0440058
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_1988
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 5:57:42 PM
Creation date
7/3/2020 11:00:43 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
1988
RECORD_ID
PR0440058
PE
4433
FACILITY_ID
FA0004518
FACILITY_NAME
NORTH COUNTY LANDFILL
STREET_NUMBER
17720
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06512004
CURRENT_STATUS
01
SITE_LOCATION
17720 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
CField
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440058_17720 E HARNEY_1988.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
231
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
These site conditions indicated a level of protection that should not <br /> allow impairment of the beneficial uses of surface waters or ground <br /> ' waters adjacent to or beneath the site. Additionally, the level of <br /> protection would not be significantly enhanced by the placement of an <br /> ' additional 1-foot-thick layer of 1 x 10-6 cm/sec material base liner <br /> that conforms to Subchapter 15 (Section 2533[b][2]) . <br /> ' As indicated in Section 2543(a) of Subchapter 15, a leachate collec- <br /> tion and removal system (LCRS) is not required in an unlined Class III <br /> sanitary landfill that does not accept sewage or wastewater treatment <br /> sludge. The North County Sanitary Landfill will meet these require- <br /> ments and, thus, will not require an LCRS. <br /> 4.7 ENTRANCE FACILITIES AND ACCESS ROADS <br /> ' Access to the proposed landfill will be from Harney Lane, which <br /> borders the site to the north. A deceleration lane will be construct- <br /> ed along Harney Lane to assist easterly moving traffic onto the site. <br /> A paved road to the entrance facility area will be constructed for <br /> all -weather access by both commercial haulers and the general public. <br /> ' The location of the entrance area, shown on Drawing 1 , will allow <br /> vehicles to queue on the site and prevent disrupting the traffic flow <br /> ' on Harney Lane. <br /> ' The entrance area will have a gate house and truck scale to record and <br /> inspect incoming wastes and collect disposal fees. A maintenance <br /> ' building with sanitary facilities and parking for landfill personnel <br /> and visitors is included. A gate near the property line on Harney <br /> Lane will be installed to prevent unauthorized entry to the landfill <br /> ' at the gate and gate house. Signs will be posted identifying the site <br /> operator, hours of operation, types of material accepted, and charges <br /> ' for disposal . <br /> ' Access roads into the active disposal areas will be graded on interme- <br /> diate cover surfaces and should be constructed of clean demolition <br /> ' PJ9 9390209A.00D 20 <br /> ' Emon Associates <br />
The URL can be used to link to this page
Your browser does not support the video tag.