My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_1988
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
17720
>
4400 - Solid Waste Program
>
PR0440058
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_1988
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 5:57:42 PM
Creation date
7/3/2020 11:00:43 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
1988
RECORD_ID
PR0440058
PE
4433
FACILITY_ID
FA0004518
FACILITY_NAME
NORTH COUNTY LANDFILL
STREET_NUMBER
17720
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06512004
CURRENT_STATUS
01
SITE_LOCATION
17720 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
CField
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440058_17720 E HARNEY_1988.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
231
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' TABLE OF CONTENTS <br /> (Continued) <br /> 5.0 OPERATING PROVISIONS 23 <br /> 5. 1 CONTROL OF INCOMING WASTE 23 <br /> ' 5.2 LANDFILLING PROCEDURES 23 <br /> 5.3 EXCAVATION AND FILL SEQUENCE 24 <br /> ' 5.4 CONTROL OF WORK 25 <br /> 5.5 CONTROL OF NUISANCE AND HEALTH FACTORS 25 <br /> ' 5.6 SITE OBSERVATION AND MAINTENANCE 26 <br /> ' 6.0 ENVIRONMENTAL MONITORING 28 <br /> 6. 1 LANDFILL GAS CONTROL AND MONITORING 28 <br /> 6.2 GROUND-WATER MONITORING 31 <br /> Tables <br /> ' Table 1 - Site Capacity and Service Life 13 <br /> Table 2 - Water Balance for the Completed Landfill 18 <br /> ' Figures <br /> Figure 1 - Vicinity Map 3 <br /> Figure 2 - Site Location Map 4 <br /> Figure 3 - Wind Rose 6 <br /> Figure 4 - Gas Monitoring Probe 29 <br /> tFigure 5 - Gas Probe Tip 30 <br /> Drawings <br /> ' Drawing 1 - Site Development Plan <br /> Drawing 2 - Excavation and Fill Sequence Plan <br /> Drawing 3 - Sections with Fill Sequence Details <br /> ' Drawing 4 - Details <br /> Appendices <br /> Appendix A - Geologic and Hydrogeologic Report <br /> Appendix B - Ground-Water Monitoring Plan <br /> ' Emon Associates <br />
The URL can be used to link to this page
Your browser does not support the video tag.