Laserfiche WebLink
' TABLE OF CONTENTS <br /> (Continued) <br /> 5.0 OPERATING PROVISIONS 23 <br /> 5. 1 CONTROL OF INCOMING WASTE 23 <br /> ' 5.2 LANDFILLING PROCEDURES 23 <br /> 5.3 EXCAVATION AND FILL SEQUENCE 24 <br /> ' 5.4 CONTROL OF WORK 25 <br /> 5.5 CONTROL OF NUISANCE AND HEALTH FACTORS 25 <br /> ' 5.6 SITE OBSERVATION AND MAINTENANCE 26 <br /> ' 6.0 ENVIRONMENTAL MONITORING 28 <br /> 6. 1 LANDFILL GAS CONTROL AND MONITORING 28 <br /> 6.2 GROUND-WATER MONITORING 31 <br /> Tables <br /> ' Table 1 - Site Capacity and Service Life 13 <br /> Table 2 - Water Balance for the Completed Landfill 18 <br /> ' Figures <br /> Figure 1 - Vicinity Map 3 <br /> Figure 2 - Site Location Map 4 <br /> Figure 3 - Wind Rose 6 <br /> Figure 4 - Gas Monitoring Probe 29 <br /> tFigure 5 - Gas Probe Tip 30 <br /> Drawings <br /> ' Drawing 1 - Site Development Plan <br /> Drawing 2 - Excavation and Fill Sequence Plan <br /> Drawing 3 - Sections with Fill Sequence Details <br /> ' Drawing 4 - Details <br /> Appendices <br /> Appendix A - Geologic and Hydrogeologic Report <br /> Appendix B - Ground-Water Monitoring Plan <br /> ' Emon Associates <br />