Laserfiche WebLink
1] <br />U <br />• A minimum 18 -inch layer of vegetative cover soil placed <br />over the low -permeability layer <br />The top soil cover will be fertilized, as necessary, and seeded with <br />moderately rooted, erosion -resistant vegetation native to the sur- <br />rounding area. Vegetation that will germinate without irrigation and <br />require minimum maintenance should be selected. Final cover slope and <br />drainage details are shown on Drawing 4. <br />Detailed construction guidelines for placement of final cover will be <br />developed when the detailed construction drawings are prepared so that <br />the final cover is completed consistent with the above requirements. <br />PJ9 9390209A.00D 22 <br />