Laserfiche WebLink
u <br />I I <br />11 <br />11 <br />0 <br />u <br />"A map showing the existing topographical contours of the <br />property and proposed final elevations of the completed <br />disposal site. The plan can be used for this purpose. The <br />approximate depths of cuts, trenches, ponds, etc., should <br />be shown on this map. The final elevations should repre- <br />sent the ultimate grading or closure plan." <br />SECTION 17616(i) <br />"Information on the underlying soils, geology, and ground <br />water occurrence, based on test borings conducted on the <br />property. Show the locations of test borings on the plan. <br />Described surface and cover soils using the Unified Soils <br />Classification System (USCS). Test borings must extend at <br />least 5 feet below the depth of the proposed disposal area. <br />Soils, geology, and ground water data must be provided by <br />qualified staff or consultants." <br />SECTION 17616(j) <br />SITE DRAINAGE <br />"Description of all surface and subsurface drains which are <br />to be used to control water from areas on, or adjacent to, <br />the disposal site. The location and type of protective dikes, <br />berms and levees shall be described." <br />"The locations of primary drains, berms, etc., should be <br />shown on the plan. The design basis of drainage control <br />devices is to be given; this may require determining typical <br />runoff coefficients and runoff volumes for 100 -year flood <br />conditions." <br />SECTION 17616(k) <br />LEACHATE SYSTEM <br />"If leachate generation is anticipated, described the method <br />of monitoring, collection, treatment, and necessary dis- <br />posal." <br />"If leachate barriers are proposed, describe their length, <br />width, depths, and design characteristics. Show the loca- <br />tion on the plan. Describe monitoring and sampling proce- <br />dures. Indicate whether barriers are in place or to be in- <br />stalled. Estimate the volume of leachate to be handled and <br />the manner of removal from the control barrier system (e.g., <br />periodic pumping). Indicate the manner of treatment and <br />point of discharge for treated leachate." <br />N <br />Section 7.2 <br />Section 8.0 <br />Section 9.0 <br />Section 10.0 <br />Rev. 0 July 19, 1989 <br />